Numerical calculation of grounding current through Capacitive Voltage Transformer due to substation switching operation

被引:0
|
作者
Liu, Lei [1 ]
Cui, Xiang [1 ]
Qi, Lei [1 ]
Li, Lin [1 ]
Gao, Changzheng [1 ]
机构
[1] N China Elect Power Univ, Minist Educ, Key Lab Power Syst Protect & Dynam Secur Monitori, Baoding, Hebei, Peoples R China
关键词
CVT; FDTD; grounding current; substation; swiching operation;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The constituent of Capacitive Voltage Transformer (CVT) are almost capacitances in primary side, and they act essentially as a short circuit to the transient current produced by a switching operation, which will generate high grounding current. Because capacitance is lumped parameter, so this paper use Finite-Difference Time Domain method (FDTD) to build calculation formula of Multi-Conductor Transmission Lines (MTL) whose branch points has lumped parameter network. Based on the formula, the grounding current through CVT produced by substation switching operation has been calculated. The calculation results of this paper are anastomotic with the simulation based on EMTP. It has certain consult meaning for the research of substation electromagnetic interference (EMI) on primary and secondary equipments.
引用
收藏
页码:518 / 521
页数:4
相关论文
共 50 条
  • [1] Switching Operation of Voltage Transformer
    Niu, Xueyuan
    Niu, Juyuan
    Shang, Xihua
    2012 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2012,
  • [2] Numerical calculation and analysis of a practical substation grounding grid
    Zhang, Liping
    Yuan, Jiansheng
    Li, Zhongxin
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2000, 15 (01): : 72 - 75
  • [3] Analysis and Simulated Experiment for Port Disturbance Voltage Due to Switching Operation in GIS Substation
    Wu H.
    Jiao C.
    Cui X.
    Liu X.
    Ji J.
    Gaodianya Jishu/High Voltage Engineering, 2017, 43 (10): : 3387 - 3395
  • [4] Voltage Drop Calculation Considering Transformer Inrush Current with EDG Operation
    Heo, Jeong-Hyeok
    Kim, Seong-Il
    Kim, Joon-Ho
    Kim, Soo-Nam
    2015 3RD INTERNATIONAL CONFERENCE ON ELECTRIC POWER EQUIPMENT - SWITCHING TECHNOLOGY (ICEPE-ST), 2015, : 455 - 458
  • [5] A NEW FORMULA FOR CALCULATION OF THE MAXIMUM STEP VOLTAGE IN A SUBSTATION GROUNDING GRID
    CHEN, CX
    XIE, GR
    ELECTRIC POWER SYSTEMS RESEARCH, 1988, 14 (01) : 41 - 49
  • [6] The Method and Structure of Switching on and off, and Regulating the Voltage of a Transformer Substation
    Klimash, V. S.
    Tabarov, B. D.
    2018 INTERNATIONAL SCIENTIFIC MULTI-CONFERENCE ON INDUSTRIAL ENGINEERING AND MODERN TECHNOLOGIES (FAREASTCON), 2018,
  • [7] Analysis of Conducted Disturbance via Current Transformer Due to Switch Operation of GIS Disconnector in UHV Substation
    Zhao, Jun
    Chen, Weijiang
    Li, Kejie
    Teng, Zihan
    Li, Ni
    Wen, Tao
    Fan, Xing
    CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2023, 9 (03): : 1227 - 1234
  • [8] Analytical modeling and calculation of core grounding current in converter transformer
    Zhou, Xiu
    Tian, Tian
    Wu, Peng
    Luo, Yan
    Bai, Jin
    He, Ninghui
    Li, Xiuguang
    FRONTIERS IN ENERGY RESEARCH, 2023, 10
  • [9] A Numerical Calculation Method of Substation Grounding Grids Based on a New Mathematical Model
    Yang, Huina
    Pan, Donghai
    ISAPE 2008: THE 8TH INTERNATIONAL SYMPOSIUM ON ANTENNAS, PROPAGATION AND EM THEORY, PROCEEDINGS, VOLS 1-3, 2008, : 805 - 808
  • [10] Influential Parameters in Lightning Current Passing a Grounding System of High Voltage Substation
    Chuong Ho Van Nhat
    Sang Trinh Minh
    2012 CONFERENCE ON POWER & ENERGY - IPEC, 2012, : 627 - 632