共 12 条
[5]
de Matta R, 1999, NAV RES LOG, V46, P19, DOI 10.1002/(SICI)1520-6750(199902)46:1<19::AID-NAV2>3.0.CO
[6]
2-L
[7]
Scheduling jobs with uncertain setup times and sequence dependency
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
1997, 25 (04)
:437-447
[8]
KUSIAK A, 1987, INFOR, V25, P2
[9]
Kusiak A., 1990, INTELLIGENT MANUFACT
[10]
Qu P, 2001, WSC'01: PROCEEDINGS OF THE 2001 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P1188, DOI 10.1109/WSC.2001.977432