Bridge user cost estimation - a synthesis of existing methods and addressing the issues of multiple counting, workzones and traffic capacity limitation

被引:14
作者
Bai, Q. [1 ]
Labi, S. [1 ]
Sinha, K. C. [1 ]
Thompson, P. D.
机构
[1] Purdue Univ, Sch Civil Engn, W Lafayette, IN 47907 USA
关键词
bridges; management; cost analysis; cost estimates; service loads;
D O I
10.1080/15732479.2011.627348
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Efforts to incorporate the concerns of bridge users in bridge investment evaluation are often stymied by lack of a comprehensive framework for assessing different user costs. There is a need to synthesise and update existing user cost estimation techniques so that the incorporation of user costs in bridge investment evaluation can be more consistent and streamlined. Secondly, a bridge detour may occur for more than one reason, thus there is a danger of multiple counting that could cause overestimation of user costs. Thirdly, user costs during bridge workzones have rarely been considered in the literature. To address these issues, this article presents a framework for comprehensive estimation of bridge user costs, an approach to address the multiple-counting problem, and a methodology for bridge workzone user cost estimation. Furthermore, the article develops a method to estimate bridge user delay cost due to traffic capacity limitation. The methodologies are demonstrated using a case study.
引用
收藏
页码:849 / 859
页数:11
相关论文
共 21 条
  • [1] AASHTO, 2005, VIRT OP VERS 5 0 SOF
  • [2] [Anonymous], 2009, LRFD BRIDG DES SPEC, V4th
  • [3] [Anonymous], 2000, HIGHW CAP MAN
  • [4] Barnes G, 2003, PER MILE COSTS OPERA
  • [5] Chen C., 1987, Bridge Management Under a Level of Service Concept Providing Optimum Improvement Action, Time, and Budget Prediction
  • [6] Fekpe E. S. K., 1995, ASCE J TRANSPORTATIO, V121, P58
  • [7] *FHWA, 2020, LTB INFOBRIDGE DAT
  • [8] Golabi K., 1992, PONTIS TECHNICAL MAN
  • [9] Johnston D.W., 1994, TRANSPORTATION RES C, V423, P139
  • [10] MathWave Technologies, 2010, EASYFIT