Cyclic scheduling in synchronous production lines

被引:27
作者
Kouvelis, P [1 ]
Karabati, S
机构
[1] Washington Univ, John M Olin Sch Business, St Louis, MO 63130 USA
[2] Koc Univ, Coll Adm Sci & Econ, Istanbul, Turkey
关键词
D O I
10.1023/A:1007697926973
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we address the scheduling problem in unpaced synchronous mixed-model production lines operated under a cyclic scheduling policy. We first discuss operations of a production line with the synchronous transfer of parts. We then present an integer programming formulation of the problem. The problem, however, is NP-hard, and for its exact solution we propose an implicit enumeration scheme. We discuss a property of the scheduling problem which allows us to effectively solve large size instances of the problem. We also present an approximate solution procedure with very good average performance. Useful managerial insights are obtained as we search for ways to improve the performance of synchronous lines. The relaxation of one of our original assumptions in the scheduling problem formulation results in an easy problem whose solution generates the absolute best in throughput performance configuration of the production line. Implementation of this solution, however, requires increasing the number of buffers in the line. We suggest other performance improvement ways to better balance the tradeoff between throughput and average Work-In-Progress (WIP) inventory in the line.
引用
收藏
页码:709 / 719
页数:11
相关论文
共 25 条
[1]  
[Anonymous], COMPLEXITY SCHEDULIN
[2]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[3]  
[Anonymous], J MANUFACTURING OPER
[4]   AN ANALYTIC FRAMEWORK FOR SEQUENCING MIXED MODEL ASSEMBLY LINES [J].
BARD, JF ;
DAREL, E ;
SHTUB, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (01) :35-48
[5]   SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH [J].
BARD, JF ;
SHTUB, A ;
JOSHI, SB .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (10) :2431-2454
[6]   A GUARANTEED-ACCURACY ROUND-OFF ALGORITHM FOR CYCLIC SCHEDULING AND SET COVERING [J].
BARTHOLDI, JJ .
OPERATIONS RESEARCH, 1981, 29 (03) :501-510
[7]  
Bazaraa MokhtarS., 1979, Nonlinear Programming: Theory and Algorithms
[8]   SEQUENCING JOBS ON AN AUTOMOBILE ASSEMBLY-LINE - OBJECTIVES AND PROCEDURES [J].
BOLAT, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (05) :1219-1236
[9]   CYCLIC SCHEDULING TO MINIMIZE INVENTORY IN A BATCH FLOW LINE [J].
DOBSON, G ;
YANO, CA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :441-461
[10]  
FUXMAN L, 1997, PRODUCTIVITY IMPROVE