Simulation based Validation of Supply Chain Effects through ICT enabled Real-Time-Capability in ETO Production Planning

被引:29
作者
Dallasega, Patrick [1 ]
Rojas, Rafael A. [1 ]
Rauch, Erwin [1 ]
Matt, Dominik T. [1 ,2 ]
机构
[1] Free Univ Bozen Bolzano, Fac Sci & Technol, Piazza Univ 5, I-39100 Bolzano, Italy
[2] Fraunhofer Italia Res Scarl, Innovat Engn Ctr, Via Macello 57, I-39100 Bolzano, Italy
来源
27TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, FAIM2017 | 2017年 / 11卷
关键词
Real-Time Capability; Production Planning; Digital Factory; Engineer-to-Order; Just-in-Time; Supply Chain Management; Industry; 4.0; ON-SITE; SYSTEMS;
D O I
10.1016/j.promfg.2017.07.187
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
According to Industry 4.0, real-time information in production planning and control, shows a high potential for optimizing the whole supply chain. The paper considers the plant building industry, especially the off-site fabrication and on-site installation. Traditionally, production planning is centralized following a Master Schedule that rarely is up to date, ignoring deviations on-site. As a result, components are delivered in advance or too late, which create non-value adding activities and high inventory levels. The paper proposes an ICT-supported nearly real-time capable production planning approach, which by means of a simulation, shows a drastically reduction of the inventory level on-site. (C) 2017 The Authors. Published by Elsevier B.V.
引用
收藏
页码:846 / 853
页数:8
相关论文
共 30 条
[1]   Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Lee, E. W. M. ;
Chan, Ricky ;
Hosseini, M. Reza .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (07) :1393-1402
[2]  
Arica E., 2013, INT WORKSH ADV MAN A
[3]   A framework for ICT-enabled real-time production planning and control [J].
Arica, Emrah ;
Powell, Daryl .
ADVANCES IN MANUFACTURING, 2014, 2 (02) :158-164
[4]  
Bednar S, 2014, INT J QUAL RES, V8, P417
[5]  
Brettel M., 2014, International Journal of Science, Engineering and Technology, V8
[6]   Highway freight terminal facilities allocation based on flexsim [J].
Chen, Li-Hong ;
Hu, Da-Wei ;
Xu, Ting .
INTELLIGENT AND INTEGRATED SUSTAINABLE MULTIMODAL TRANSPORTATION SYSTEMS PROCEEDINGS FROM THE 13TH COTA INTERNATIONAL CONFERENCE OF TRANSPORTATION PROFESSIONALS (CICTP2013), 2013, 96 :368-381
[7]  
Dallasega P., 2015, P INT C IND ENG OP M, P1
[8]  
Dallasega P., P 24 ANN C INT GROUP, P32
[9]   Customer-oriented Production System for Supplier Companies in CTO [J].
Dallasega, Patrick ;
Rally, Peter ;
Rauch, Erwin ;
Matt, Dominik T. .
FACTORIES OF THE FUTURE IN THE DIGITAL ENVIRONMENT, 2016, 57 :533-538
[10]   Sustainability in the supply chain through synchronization of demand and supply in ETO-companies [J].
Dallasega, Patrick ;
Rauch, Erwin ;
Matt, Dominik T. .
22ND CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2015, 29 :215-220