Stowage planning in maritime container transportation

被引:71
作者
Kang, JG
Kim, YD [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Yusong Gu, Taejon 305701, South Korea
[2] Swiss Fed Inst Technol, EPFL, CH-1015 Lausanne, Switzerland
关键词
stowage planning; heuristics; sea transport;
D O I
10.1057/palgrave.jors.2601322
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a stowage-planning problem of arranging containers on a container ship in the maritime transportation system. Since containers are accessible only from the top of the stack, temporary unloading and reloading of containers, called shifting, is unavoidable if a container required to be unloaded at the current port is stacked under containers to be unloaded at later ports on the route of the ship. The objective of the stowage planning problem is to minimize the time required for shifting and crane movements on a tour of a container ship while maintaining the stability of the ship. For the problem, we develop a heuristic solution method in which the problem is divided into two subproblems, one for assigning container groups into the holds and one for determining a loading pattern of containers assigned to each hold. The former subproblem is solved by a greedy heuristic based on the transportation simplex method, while the latter is solved by a tree search method. These two subproblems are solved iteratively using information obtained from solutions of each other. To see the performance of the suggested algorithm, computational tests are performed on problem instances generated based on information obtained from an ocean container liner. Results show that the suggested algorithm works better than existing algorithms.
引用
收藏
页码:415 / 426
页数:12
相关论文
共 14 条
[1]   On the fixed-charge transportation problem [J].
Adlakha, V ;
Kowalski, K .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (03) :381-388
[2]   EXACT AND APPROXIMATE SOLUTIONS OF THE CONTAINER SHIP STOWAGE PROBLEM [J].
AVRIEL, M ;
PENN, M .
COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) :271-274
[3]   Stowage planning for container ships to reduce the number of shifts [J].
Avriel, M ;
Penn, M ;
Shpirer, N ;
Witteboon, S .
ANNALS OF OPERATIONS RESEARCH, 1998, 76 (0) :55-71
[4]  
BOTTER RC, 1992, IFIP TRANS B, V5, P217
[5]   A HEURISTIC FOR A CLASS OF PRODUCTION PLANNING AND SCHEDULING PROBLEMS [J].
GILBERT, KC ;
MADAN, MS .
IIE TRANSACTIONS, 1991, 23 (03) :282-289
[6]  
Hillier F, 2015, INTRO OPERATIONS RES
[7]  
MURTY KG, 1995, OPERATIONS RES DETER
[8]   A BRANCH-AND-BOUND METHOD FOR THE FIXED CHARGE TRANSPORTATION PROBLEM [J].
PALEKAR, US ;
KARWAN, MH ;
ZIONTS, S .
MANAGEMENT SCIENCE, 1990, 36 (09) :1092-1105
[9]   A BRANCH AND BOUND SOLUTION METHOD FOR THE CRANE SCHEDULING PROBLEM [J].
PETERKOFSKY, RI ;
DAGANZO, CF .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1990, 24 (03) :159-172
[10]  
SAGINAW DJ, 1989, MAR TECHNOL SNAME N, V26, P47