On The Change of Cost Risk and Uncertainty throughout the Life Cycle of Manufacturing Products

被引:1
|
作者
Schwabe, Oliver [1 ,2 ]
Erkoyuncu, John A. [2 ]
Shehab, Essam [2 ]
机构
[1] Rolls Royce PLC, London, England
[2] Cranfield Univ, Bldg 50, Bedford MK43 0AL, Beds, England
来源
7TH CIRP GLOBAL WEB CONFERENCE - TOWARDS SHIFTED PRODUCTION VALUE STREAM PATTERNS THROUGH INFERENCE OF DATA, MODELS, AND TECHNOLOGY (CIRPE 2019) | 2019年 / 86卷
关键词
Cost Risk and Uncertainty; Dynamic Propagation; Financial Contingency;
D O I
10.1016/j.procir.2020.01.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In practice cost estimators typically assume that cost risk and uncertainty continuously decrease across the whole product life cycle. Industry case studies and semi-structured interviews indicate that while cost risk and uncertainty decreases between technology readiness levels / stage gates, it increases when technology readiness levels / stage gates change. This increase can lead to cost risk and uncertainty levels above those at previous technology readiness levels / stage gates. This difference between assumptions in practice and evidence from case studies and semi-structured interviews may lead to the over- and / or under-assignment of capital reserves over time, thus resulting in binding project capital unnecessarily and / or the need to increase projects budgets in an unplanned manner Further research is suggested regarding the scale of changes in cost risk and uncertainty when technology readiness level changes / stage gates are arrived at in order to improve robustness of forecasting efforts. (C) 2019 The Authors. Published by Elsevier B.V. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/) Peer-review under responsibility of the scientific committee of the 7th CIRP Global Web Conference
引用
收藏
页码:239 / 244
页数:6
相关论文
共 50 条
  • [1] Environmental Consideration throughout Entire Life Cycle of Products
    Yanagawa, Masashi
    Musha, Yuta
    Kawata, Hiroyuki
    Shinomura, Yoshiko
    FUJITSU SCIENTIFIC & TECHNICAL JOURNAL, 2014, 50 (04): : 52 - 59
  • [2] Maintenance Support throughout the Life-Cycle of High Value Manufacturing Products. Interoperability Issues
    Fedotova, Alena
    Taratoukhine, Victor
    Kupriyanov, Yury
    ENTERPRISE INTEROPERABILITY: RESEARCH AND APPLICATIONS IN THE SERVICE-ORIENTED ECOSYSTEM, 2013, : 69 - 78
  • [3] Risk Management Throughout The Product Life Cycle
    Cechova, Lenka
    Simon, Michal
    CREATING GLOBAL COMPETITIVE ECONOMIES: A 360-DEGREE APPROACH, VOLS 1-4, 2011, : 347 - 349
  • [4] Uncertainty in Life Cycle Cost of Railway Track
    Patra, Ambika Prasad
    Soderholm, Peter
    Kumar, Uday
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2008 PROCEEDINGS, 2008, : 44 - +
  • [5] Importance of Dairy Products in Nutrition and Health Throughout the Life Cycle
    Rodrigo Valenzuela, B.
    ANNALS OF NUTRITION AND METABOLISM, 2024, 80 : 10 - 10
  • [6] RISK DYNAMICS THROUGHOUT THE SYSTEM DEVELOPMENT LIFE CYCLE
    Yu, Chia-Ing
    Chen, Houn-Gee
    Klein, Gary
    Jiang, James J.
    JOURNAL OF COMPUTER INFORMATION SYSTEMS, 2013, 53 (03) : 28 - 37
  • [7] Climate change threatens Chinook salmon throughout their life cycle
    Crozier, Lisa G.
    Burke, Brian J.
    Chasco, Brandon E.
    Widener, Daniel L.
    Zabel, Richard W.
    COMMUNICATIONS BIOLOGY, 2021, 4 (01)
  • [8] Climate change threatens Chinook salmon throughout their life cycle
    Lisa G. Crozier
    Brian J. Burke
    Brandon E. Chasco
    Daniel L. Widener
    Richard W. Zabel
    Communications Biology, 4
  • [9] Distribution of natural radionuclides throughout intermediate products of manufacturing cycle of titanium production
    Grashchenko, SM
    Kudryavskii, YP
    Abramov, DS
    Shishkunova, LV
    Gritchenko, ZG
    RADIOCHEMISTRY, 1996, 38 (02) : 166 - 169
  • [10] Optimising life cycle and efficiency of products and manufacturing processes
    Smilda, Andries
    ZKG INTERNATIONAL, 2022, 75 (07): : 42 - 46