共 50 条
[1]
[Anonymous], SAE T J MAT MANUF
[2]
[Anonymous], ENTERPRISE RESOURCE
[3]
[Anonymous], THESIS CORNELL U ITH
[4]
[Anonymous], THESIS CORNELL U ITH
[5]
SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP
[J].
MANAGEMENT SCIENCE,
1984, 30 (09)
:1093-1104
[8]
Browne J., 1984, FMS Magazine, V2, P114
[9]
Scheduling of FMSs with information delays: A simulation study
[J].
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS,
2005, 17 (01)
:39-65
[10]
On the consequences of information delays in the scheduling of semi-automated flexible machines
[J].
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS,
2005, 16 (03)
:251-275