Construction industry faces challenges with relevancy problems related to labor productivity. Numerous ways are implemented to quantify the damages which are resulted from poor labors productivity in construction. The aim of this paper is to spot the impact of poor labor productivity on the construction project cost. Using the measured baseline productivity and determining the difference between the actual cumulated times and the baseline estimation at the ending of the work period, the increase of the project cost is going to be determined. The data was collected, measured and investigated from a mega construction project in Egypt. The project consists of 18 apartment buildings with an area 1600 square meter for each building. The study is based on data which was taken through 69 daily works of labor celling steel fixer's productivity over a 6-month period. It was concluded that the final labor cost of the project was greater than the estimated cost as a result of the poor labor productivity. Finally, the time used by a construction laborer to complete the total quantities of the work in normal operating condition averages about 81% of the overall time used.
引用
收藏
页码:2356 / 2363
页数:8
相关论文
共 31 条
  • [1] Adrian JJ., 1987, CONSTRUCTION PRODUCT
  • [2] Labour productivity statistics: a reality check for the Norwegian construction industry
    Ahmad, Saad Bin Saleem
    Mazhar, Muhammad Usman
    Bruland, Amund
    Andersen, Bjorn Sorskot
    Langlo, Jan Alexander
    Torp, Olav
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (01) : 39 - 52
  • [3] Factors affecting construction labour productivity in Yemen
    Alaghbari, Wael
    Al-Sakkaf, Abubaker A.
    Sultan, Basel
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (01) : 79 - 91
  • [4] Alinaitwe H, 2005, P CIB 2006 CONSTR 21
  • [5] Alinaitwe Henry Mwanaki, 2007, Journal of Civil Engineering and Management, V13, P169
  • [6] Deming WE, 1986, OUT CRISIS, DOI [10.1080/15623599.2017.1326302, DOI 10.1080/15623599.2017.1326302]
  • [7] Drewin F.J., 1982, Construction productivity : measurement and improvement through work study
  • [8] Grant E.E., 1988, STAT QUALITY CONTROL, V6th
  • [9] Hafez S.M., 2014, AM J CIVIL ENG, P35, DOI DOI 10.11648/J.AJCE.20140202.14
  • [10] Impact of extended overtime on construction labor productivity
    Hanna, AS
    Taylor, CS
    Sullivan, KT
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (06) : 734 - 739