An Improved Genetic Algorithm For Just-In-Time Job-Shop Scheduling Problem

被引:4
|
作者
Yang, Hongan [1 ]
Li, Jinyuan [1 ]
Qi, Liangliang [1 ]
机构
[1] Northwestern Polytech Univ, Syst Integrat & Engn Management Inst, Xian 710072, Peoples R China
来源
关键词
Job-Shop; JIT; Improved Genetic Algorithm; Three-stage decoding mechanism;
D O I
10.4028/www.scientific.net/AMR.472-475.2462
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies a just-in-time job-shop scheduling problem (JITJSSP) in which each operation has an earliness cost or a tardiness cost if it is completed before or after its due date and the objective function is to minimize the total earliness and tardiness costs of all operations. In order to solve this problem, an improved genetic algorithm (IGA) is introduced in this paper. IGA utilizes an operation-based scheme to represent schedules as chromosomes. Then, each chromosome is processed through a three-stage mechanism. Firstly, the semi-active decoding process is employed to expand the search space of solutions and guarantee comprehensive solutions. Secondly, the greedy insertion mechanism for tardy operations is executed to move the tardy operations left to the appropriate idle time to reduce the tardiness costs. Finally, the greedy insertion mechanism for early operations is proposed to shift the early operations right to the suitable idle time to decrease the earliness costs. After the maximum number of generations is reached, IGA continues with selection, crossover and mutation. The experimental results finally show that most of solutions on the benchmarks are improved by our algorithm.
引用
收藏
页码:2462 / 2467
页数:6
相关论文
共 50 条
  • [1] Genetic Algorithm and Local Search for Just-in-Time Job-Shop Scheduling
    Araujo, Rodolfo Pereira
    dos Santos, Andre Gustavo
    Claudio Arroyo, Jose Elias
    2009 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-5, 2009, : 955 - 961
  • [2] An improved genetic algorithm for Job-shop scheduling problem
    Lou Xiao-fang
    Zou Feng-xing
    Gao Zheng
    Zeng Ling-li
    Ou Wei
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 2595 - +
  • [3] Improved genetic algorithm for the job-shop scheduling problem
    Tung-Kuan Liu
    Jinn-Tsong Tsai
    Jyh-Horng Chou
    The International Journal of Advanced Manufacturing Technology, 2006, 27 : 1021 - 1029
  • [4] Improved genetic algorithm for the job-shop scheduling problem
    Liu, Tung-Kuan
    Tsai, Jinn-Tsong
    Chou, Jyh-Horng
    International Journal of Advanced Manufacturing Technology, 2006, 27 (9-10): : 1021 - 1029
  • [5] An Improved Genetic Algorithm for the Job-Shop Scheduling Problem
    Hong, Hui
    Li, Tianying
    Wang, Hongtao
    DCABES 2008 PROCEEDINGS, VOLS I AND II, 2008, : 621 - +
  • [6] Improved genetic algorithm for the job-shop scheduling problem
    Liu, TK
    Tsai, JT
    Chou, JH
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 27 (9-10): : 1021 - 1029
  • [7] Lagrangian bounds for just-in-time job-shop scheduling
    Baptiste, Philippe
    Flamini, Marta
    Sourd, Francis
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (03) : 906 - 915
  • [8] Solving Job-shop Scheduling Problem by an Improved Genetic Algorithm
    Yang Yanli
    Ke Weiwei
    PRECISION ENGINEERING AND NON-TRADITIONAL MACHINING, 2012, 411 : 588 - 591
  • [9] Solving Job-Shop Scheduling Problem with Improved Genetic Algorithm
    Wu, Weijun
    Yu, Songnian
    Ding, Wang
    PROCEEDINGS OF 2008 INTERNATIONAL PRE-OLYMPIC CONGRESS ON COMPUTER SCIENCE, VOL II: INFORMATION SCIENCE AND ENGINEERING, 2008, : 348 - 352
  • [10] An improved adaptive genetic algorithm for job-shop scheduling problem
    Xing, Yingjie
    Chen, Zhentong
    Sun, Jing
    Hu, Long
    ICNC 2007: THIRD INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 4, PROCEEDINGS, 2007, : 287 - +