摘要
One of the most common problems due to the construction of tunnels in urban areas is settlement and its measurement. Settlement due to tunnel excavation varies in quantity and depends on several factors such as tunnel geometry, ground condition, method of excavation and so on. For construction work near existing urban facilities, underground tunnels that are excavated being by slurry pipe jacking are being increasingly employed in order to avoid problems such as subsidence. This paper will discuss and predict the raised settlement from using large diameter slurry pipe jacking methods in non-cohesive soils in Fujisawa, Japan; thus, being called the Fujisawa project. From this study, it has been found that the prediction of settlement in non-cohesive soils by traditional methods of monitoring such as surface leveling and subsurface inclination measurement is not successful and can only be controlled by using machine penetration data, particularly discharged mud density data that can give assured prediction of any hazards.
引用
收藏
页码:377 / 382
页数:6
相关论文
共 50 条
  • [1] Small diameter tunnel excavation method using slurry pipe-jacking
    Shimada H.
    Khazaei S.
    Matsui K.
    Geotechnical & Geological Engineering, 2004, 22 (2) : 161 - 186
  • [2] A New Method for Predicting Ground Settlement Induced by Pipe Jacking Construction
    Niu, Zelin
    Cheng, Yun
    Zhang, Yuwei
    Song, Zhanping
    Yang, Guiyang
    Li, Hui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [3] Study on stability of soil around micro-tunnel construction using slurry pipe-jacking
    Shimada, H
    Sasaoka, T
    Kubota, S
    Matsui, K
    GEOTECHNICAL ENGINEERING MEETING SOCIETY'S NEEDS, VOLS 1 AND 2, PROCEEDINGS, 2001, : 425 - 429
  • [4] Influence of construction sequence of pipe jacking by pipe-roof pre-construction method on ground surface settlement
    Yang S.-S.
    Wang M.
    Du J.-A.
    Guo Y.
    Gen Y.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2020, 54 (09): : 1706 - 1714
  • [5] Influence of steel pipe jacking on earth surface settlement in pipe roof pre-construction method
    Yang, Xian
    Zhang, Ke-Neng
    Li, Zhong
    Deng, Mei-Long
    Xiao, Zun-Qun
    Shenyang Gongye Daxue Xuebao/Journal of Shenyang University of Technology, 2012, 34 (04): : 469 - 473
  • [6] Research on tunnel ground settlement characteristics by shield method and pipe-jacking method based on numerical simulation
    Lin, Tingyu
    Gong, Jianwu
    2020 3RD INTERNATIONAL CONFERENCE OF GREEN BUILDINGS AND ENVIRONMENTAL MANAGEMENT, 2020, 531
  • [7] Jet grouting and pipe jacking in a shallow urban tunnel construction
    Guatteri, G
    Koshima, A
    Mosiici, P
    Harada, T
    Sozio, LE
    GROUTING AND DEEP MIXING, VOL 1, 1996, : 291 - 294
  • [8] Pipe jacking tunnel construction crossing the Bang Pakong River
    Piriyakul, K.
    Pochalard, S.
    Rungrueng, E.
    Geotechnical Aspects of Underground Construction in Soft Ground - Proceedings of the 10th International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, IS-CAMBRIDGE 2022, 2021, : 123 - 128
  • [9] Research on Dewatering Characteristics of Waste Slurry from Pipe Jacking Construction
    Jiang, Libing
    Zhen, Liang
    Wang, Jianfeng
    Zhang, Tao
    Huang, Xianwen
    MATERIALS, 2022, 15 (06)
  • [10] Detection and analysis of slurry jacket for pipe jacking construction in soft ground
    Cui, Hao
    Kou, Lei
    Xiong, Zhihui
    Zhao, Jinjie
    JOURNAL OF CIVIL STRUCTURAL HEALTH MONITORING, 2023, 13 (2-3) : 309 - 317