Embankment Dam Breach Parameters and Their Uncertainties

被引:191
作者
Froehlich, David C.
机构
[1] Consulting Engineer, 303 Frenchmans Bluff Dr., Cary, 27513-5662, NC
来源
JOURNAL OF HYDRAULIC ENGINEERING-ASCE | 2008年 / 134卷 / 12期
关键词
D O I
10.1061/(ASCE)0733-9429(2008)134:12(1708)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Potential flood hazards that would be created by breached embankment dams need to be evaluated to select spillway design floods and to prepare emergency action plans. The breaches are often modeled simply, usually in the shape of a trapezoid that is defined by its final height, base width or average width, and side slopes, along with the time needed for the opening to form completely. Data collected from 74 embankment dam failures were used to develop mathematical expressions for the expected values of the final width and side slope of a trapezoidal breach along with its formation time. Information is provided that allows variances of the predicted quantities to be calculated as well. The findings of the statistical analysis were then applied in a Monte Carlo simulation to estimate the degree of uncertainty of predicted peak flows and water levels downstream from breached embankment dams.
引用
收藏
页码:1708 / 1721
页数:14
相关论文
共 105 条
  • [1] AlQaser G., 1991, THESIS COLORADO STAT
  • [2] AMBLER JN, 1912, ENG NEWS, V67, P667
  • [3] [Anonymous], CPD68 US ARM CORPS E
  • [4] [Anonymous], 1965, ENG NEWS REC, V174, P28
  • [5] [Anonymous], 1926, ENG NEWS REC, V96, P913
  • [6] [Anonymous], 1974, LESS DAM INC
  • [7] [Anonymous], 1982, Introduction to Linear Regression Analysis
  • [8] [Anonymous], 1923, ENG NEWS REC, V91, P357
  • [9] [Anonymous], 1889, ENG NEWS, V22, P193
  • [10] [Anonymous], 1977, ENG NEWS REC, V199, P9