Bicriteria robotic cell scheduling

被引:17
作者
Gultekin, Hakan [1 ]
Akturk, M. Selim [1 ]
Karasan, Oya Ekin [1 ]
机构
[1] Bilkent Univ, Dept Ind Engn, TR-06800 Ankara, Turkey
关键词
Robotic cell; CNC; Bicriteria optimization; Controllable processing times;
D O I
10.1007/s10951-007-0033-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers the scheduling problems arising in two- and three-machine manufacturing cells configured in a flowshop which repeatedly produces one type of product and where transportation of the parts between the machines is performed by a robot. The cycle time of the cell is affected by the robot move sequence as well as the processing times of the parts on the machines. For highly flexible CNC machines, the processing times can be changed by altering the machining conditions at the expense of increasing the manufacturing cost. As a result, we try to find the robot move sequence as well as the processing times of the parts on each machine that not only minimize the cycle time but, for the first time in robotic cell scheduling literature, also minimize the manufacturing cost. For each 1-unit cycle in two- and three-machine cells, we determine the efficient set of processing time vectors such that no other processing time vector gives both a smaller cycle time and a smaller cost value. We also compare these cycles with each other to determine the sufficient conditions under which each of the cycles dominates the rest. Finally, we show how different assumptions on cost structures affect the results.
引用
收藏
页码:457 / 473
页数:17
相关论文
共 21 条
[1]   Robotic cell scheduling with operational flexibility [J].
Akturk, MS ;
Gultekin, H ;
Karasan, OE .
DISCRETE APPLIED MATHEMATICS, 2005, 145 (03) :334-348
[2]  
Brauner N, 1999, INFOR, V37, P20
[3]   Bicriterion single machine scheduling with resource dependent processing times [J].
Cheng, TCE ;
Janiak, A ;
Kovalyov, MY .
SIAM JOURNAL ON OPTIMIZATION, 1998, 8 (02) :617-630
[4]   A faster polynomial algorithm for 2-cyclic robotic scheduling [J].
Chu, CB .
JOURNAL OF SCHEDULING, 2006, 9 (05) :453-468
[5]   Cyclic scheduling of identical parts in a robotic cell [J].
Crama, Y ;
Van de Klundert, J .
OPERATIONS RESEARCH, 1997, 45 (06) :952-965
[6]  
Crama Y., 1999, Journal of Scheduling, V2, P35, DOI 10.1002/(SICI)1099-1425(199901/02)2:1<35::AID-JOS15>3.0.CO
[7]  
2-J
[8]   Cyclic scheduling in robotic flowshops [J].
Crama, Y ;
Kats, V ;
van de Klundert, J ;
Levner, E .
ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) :97-124
[9]   SINGLE-MACHINE SCHEDULING WITH CONTROLLABLE PROCESSING TIMES AND NUMBER OF JOBS TARDY [J].
DANIELS, RL ;
SARIN, RK .
OPERATIONS RESEARCH, 1989, 37 (06) :981-984
[10]   Sequencing and scheduling in robotic cells: Recent developments [J].
Dawande, M ;
Geismar, HN ;
Sethi, SP ;
Sriskandarajah, C .
JOURNAL OF SCHEDULING, 2005, 8 (05) :387-426