Hydraulic Analysis of Immersed Tunnel Element's Immersion and Its Application
被引:1
作者:
Su, Linwang
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Teconol, Guangzhou 510641, Guangdong, Peoples R China
CCCC Fourth Harbor Engn Inst Co Ltd, Guangzhou 510288, Guangdong, Peoples R ChinaSouth China Univ Teconol, Guangzhou 510641, Guangdong, Peoples R China
Su, Linwang
[1
,2
]
Kang, Lan
论文数: 0引用数: 0
h-index: 0
机构:
CCCC Fourth Harbor Engn Inst Co Ltd, Guangzhou 510288, Guangdong, Peoples R ChinaSouth China Univ Teconol, Guangzhou 510641, Guangdong, Peoples R China
Kang, Lan
[2
]
机构:
[1] South China Univ Teconol, Guangzhou 510641, Guangdong, Peoples R China
[2] CCCC Fourth Harbor Engn Inst Co Ltd, Guangzhou 510288, Guangdong, Peoples R China
Immersed tunnel;
Immersion;
Hydraulic analysis;
Time domain;
Cable line;
D O I:
10.4028/www.scientific.net/AMR.250-253.2360
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
The time domain responses of the immersed tunnel element under typical load combination case during its immersion are investigated based on the 3D potential method. The varied cross-section complicated model is built. The typical environmental and immersion parameters are considered. The results of different line models are compared and investigated. Numerical results demonstrate the effects of the mooring lines' condition. The "optimum" balance between relative large mooring stiffness and relative safety tension can be realized by combining the coarse calculation and hydraulic exact analysis.