Short-term hydro generation scheduling of Three Gorges-Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

被引:48
作者
Mo, Li [1 ]
Lu, Peng [1 ]
Wang, Chao [1 ]
Zhou, Jianzhong [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Peoples R China
基金
中国国家自然科学基金;
关键词
Multi ant colony system; Adaptive differential evolution; Short-term hydro generation scheduling; Global optimal; DIFFERENTIAL EVOLUTION; UNIT COMMITMENT; ALGORITHM; OPTIMIZATION;
D O I
10.1016/j.enconman.2013.07.047
中图分类号
O414.1 [热力学];
学科分类号
摘要
Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD) sub-problem. Then, we present a hybrid algorithm based on multi ant colony system (MACS) and differential evolution (DE) for solving the STHGS problem. First, MACS is used for dealing with UC sub-problem. A set of cooperating ant colonies cooperate to choose the unit state over the scheduled time horizon. Then, the adaptive differential evolution (ADE) is used to solve ELD sub-problem. MACS and ADE are run in parallel with adjusting their solutions in search of a better solution. Meanwhile, local and global pheromone updating rules in MACS and adaptive dynamic parameter adjusting strategy in DE are applied for enhancing the search ability of MACS-ADE. Finally, the proposed method is implemented to solve STHGS problem of Three Gorges-Gezhouba cascaded hydropower plants to verify the feasibility and effectiveness. Compared with other established methods, the simulation results reveal that the proposed MACS-ADE approach has the best convergence property, computational efficiency with less water consumption. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:260 / 273
页数:14
相关论文
共 42 条
  • [1] [Anonymous], 2004, ANT COLONY OPTIMIZAT
  • [2] [Anonymous], 2013, Power generation, operation, and control
  • [3] Bakken BH, 2002, 2002 IEEE POWER ENGINEERING SOCIETY SUMMER MEETING, VOLS 1-3, CONFERENCE PROCEEDINGS, P1522, DOI 10.1109/PESS.2002.1043646
  • [4] Caro G.D, 1999, NEW IDEAS OPTIMIZATI, P11, DOI DOI 10.1109/CEC.1999.782657
  • [5] Mixed-Integer Nonlinear Programming Approach for Short-Term Hydro Scheduling
    Catalao, J. P. S.
    Pousinho, H. M. I.
    Mendes, V. M. F.
    [J]. IEEE LATIN AMERICA TRANSACTIONS, 2010, 8 (06) : 658 - 663
  • [6] Hydro energy systems management in Portugal: Profit-based evaluation of a mixed-integer nonlinear approach
    Catalao, J. P. S.
    Pousinho, H. M. I.
    Mendes, V. M. F.
    [J]. ENERGY, 2011, 36 (01) : 500 - 507
  • [7] Scheduling of Head-Sensitive Cascaded Hydro Systems: A Nonlinear Approach
    Catalao, J. P. S.
    Mariano, S. J. P. S.
    Mendes, V. M. F.
    Ferreira, L. A. F. M.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (01) : 337 - 346
  • [8] Genetic algorithms and non-intrusive energy management system based economic dispatch for cogeneration units
    Chang, Hsueh-Hsien
    [J]. ENERGY, 2011, 36 (01) : 181 - 190
  • [9] Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch
    Cheng, Chun-tian
    Liao, Sheng-li
    Tang, Zi-Tian
    Zhao, Ming-yan
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (12) : 3007 - 3014
  • [10] Distributed implementation of generation scheduling algorithm on interconnected power systems
    Chung, K. H.
    Kim, B. H.
    Hur, D.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (12) : 3457 - 3464