A Computer-Aided System for Job-Shop Flow Time and Due-Date Prediction

被引:0
作者
Akinnuli, B. O. [1 ]
Oluwadare, S. A. [2 ]
Aderoba, A. A. [1 ]
机构
[1] Fed Univ Technol Akure, Dept Mech Engn, PMB 704, Akure, Nigeria
[2] Fed Univ Technol Akure, Dept Comp Sci, Akure, Nigeria
来源
ADVANCES IN MATERIALS AND SYSTEMS TECHNOLOGIES III | 2012年 / 367卷
关键词
Computer-Aided system; Job-shop; Flow time; Due date; SIMULATION;
D O I
10.4028/www.scientific.net/AMR.367.639
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
One of the key challenges confronting a production system is the accurate prediction of flow time (completion time) and due date of jobs coming into the job-shop. The inaccuracy in the determination of flow time and due date could lead to problems of dead line misses, high holding cost for waiting jobs and/or completed jobs, technical and cost inefficiency; and customer dissatisfaction, among others. In this paper, a Computer-Aided System which is based on an empirical model for predicting job-shop flow time and due-date was developed. The Computer-Aided System makes use of historical production data and other peculiar in-house factors of an organization. The Computer-Aided System was tested with real life job-shop data in order to test its efficiency and it was found to be efficient in predicting flow time and due date of jobs.