Critical success factors for post-disaster infrastructure recovery Learning from the Canterbury (NZ) earthquake recovery

被引:20
作者
Liu, Miao [1 ]
Scheepbouwer, Eric [2 ]
Giovinazzi, Sonia [1 ]
机构
[1] Univ Canterbury, Dept Civil & Nat Resources Engn, Christchurch 1, New Zealand
[2] Univ Canterbury, Dept Civil & Nat Resources Engn, Construct Management Postgrad Programme, Christchurch 1, New Zealand
关键词
Decision making; Infrastructure; Critical success factor; Post-disaster recovery; Disaster management; Canterbury earthquake;
D O I
10.1108/DPM-01-2016-0006
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Purpose - The purpose of this paper is to synthesise critical success factors (CSFs) for advancing post-disaster infrastructure recovery and underpinning recovery authorities in decision making when facing future disasters. Design/methodology/approach - The seismic recovery after the Canterbury (NZ) earthquake sequence in 2010-2011 was selected as a case study for identifying CSFs for an efficient recovery of infrastructure post-disaster. A combination of research approaches, including archival study, observations and semi-structured interviews were conducted for collecting data and evidences by engaging with participants involved at various tiers in the post-disaster recovery and reconstruction. The CSFs are evaluated and analysed by tracking the decision-making process, examining resultant consequences and foreseeing onwards challenges. Findings - Six salient CSFs for strengthening infrastructure recovery management after disasters are identified. Furthermore, the study shows how each of these CSFs have been incorporated into the decision-making process in support of the post-disaster recovery and what difficulties encountered in the recovery process when implementing. Practical implications - The proposed CSFs provide a future reference and guidance to be drawn on by decision makers when project-managing post-disaster recovery operations. Originality/value - The value of the paper is that it bridges the gap between managerial contexts and technical aspects of post-disaster recovery process in an effort to rapidly and efficiently rebuild municipal infrastructure.
引用
收藏
页码:685 / 700
页数:16
相关论文
共 49 条
[1]  
[Anonymous], J CONSTRUCTION ENG M
[2]   Evolution of the 2010-2012 Canterbury earthquake sequence [J].
Bannister, S. ;
Gledhill, K. .
NEW ZEALAND JOURNAL OF GEOLOGY AND GEOPHYSICS, 2012, 55 (03) :295-304
[3]  
Botha P., 2015, P TRANSP RES BOARD 9
[4]  
Brown C, 2011, AUST J EMERG MANAG, V26, P19
[5]  
Canterbury Development Corporation (CDC), 2015, CHRISTCH EC INFR SIT
[6]  
Chow W. S., 2000, Information Management & Computer Security, V8, P80, DOI 10.1108/09685220010321326
[7]  
Christchurch City Council, 2012, CHRISTCH CIT COUNC C
[8]  
Christchurch City Council, 2013, CHRISTCH CIT COUNC I
[9]  
Christchurch City Council, 2012, WORKING PAPER
[10]  
Christchurch City Council (CCC), 2013, CANT EARTHQ REC COST