The problems and suggestions of the desulfurization wastewater Treatment system during the operation

被引:4
作者
Dong, Xuefeng [1 ]
Shen, Guifen [1 ]
Zhou, Xiaoxiang [1 ]
Guo, Jinjuan [1 ]
Zhang, Xueying [1 ]
Wu, Wenlong [1 ]
机构
[1] Henan Elect Power Res Inst, Zhengzhou 450052, Peoples R China
来源
ADVANCES IN ENVIRONMENTAL ENGINEERING | 2012年 / 599卷
关键词
desulfurization waste water; operation and control; problems and suggestions;
D O I
10.4028/www.scientific.net/AMR.599.521
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Wastewater treatment system was an important part of the wet desulfurization, and it played an important role to improve the quality of absorber slurry. Combined with the problems of desulfurization efficient reduced and moisture content in gypsum exceed normal, this paper pointed out the deficiencies which used the chlorine ion concentration to control the operation of desulfurization waster water; and suggested the influence of chlorine ion and the other impurities should be studied comprehensively, some guides for in-service supervision on the operation of FGD should be established as soon as possible.
引用
收藏
页码:521 / 524
页数:4
相关论文
共 18 条
[1]  
[Anonymous], 11492010 DLT
[2]  
[Anonymous], 2011, ANN REP POW GEN BUS, V8, P38
[3]  
Cao Lili, 2005, CHINA ELECT POWER, V38, P73
[4]  
Dehou Jiang, 2009, CHINA ELECT POWER, V42, P70
[5]  
Dongming Guo, 2007, DESULPHURIZATION TEC, P17
[6]  
Lianqing Yin, 2008, FLY ASH, V12-13, P17
[7]  
Qiyi Yu, 2004, ELECT POWER ENV PROT, V20, P56
[8]  
Shufang Zhang, 2009, ENERGY ENV PROTECTIO, V23, P50
[9]  
Tinghua Zeng, 2003, WET FLUE GAS DESULFU, P20
[10]  
UKAWA N, 1993, AICHE J, V12, P238