Grid Resource Scheduling Method Based on BP Neural Network

被引:0
作者
Li, Min [1 ,2 ]
Li, Zhenhua [2 ]
机构
[1] Jingchu Univ Technol, Jingmen 448000, Hubei, Peoples R China
[2] China Univ Geosci, Wuhan 430074, Peoples R China
来源
COMPUTATIONAL INTELLIGENCE AND INTELLIGENT SYSTEMS | 2012年 / 316卷
关键词
Grid; Resource Scheduling; BP;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The grid mesh is a high performance calculation of the main direction, the influence of the grid function and performance of the main factors for the efficiency of the grid resources scheduling, because of the complexity of the grid, the resource management compared with the traditional distributed network more complicated, so efficient grid resources scheduling algorithm is grid research hot spot and the difficulty. This paper puts forward a layered resource scheduling model and a simple structure function complete resources scheduling method, and put forward feedback of the BP neural network algorithm applied to the grid resources scheduling of better solve the grid resources scheduling problem.
引用
收藏
页码:522 / +
页数:2
相关论文
共 11 条
[1]  
Gao Z., 2010, GRID TASK SCHEDULING
[2]  
Hu Z., 2009, J SYSTEM SIMULATION, P3542
[3]  
Li X., 2010, J COMPUTER SCI
[4]  
Li Z., 2005, COMPUTER ENG
[5]  
Liu H., 2011, J COMPUTER SCI
[6]  
Lv G., 2007, GRID RESOURCE SCHEDU
[7]  
Minh T, 2008, LECT NOTES COMPUT SC, V5036, P492, DOI 10.1007/978-3-540-68083-3_47
[8]  
Nan X., 2010, 2010 INT C INF SCI M, V2, P185
[9]   Research on Power Load Forecasting Based on Combined Model of Markov and BP Neural Networks [J].
Niu, Dongxiao ;
Shi, Hui ;
Li, Jianqing ;
Xu, Cong .
2010 8TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2010, :4372-4375
[10]  
Zhang M.-G., 2011, 2011 IEEE POW ENG AU, V1, P319