Structural Performance of Steel Pile Caps Strengthened with Perfobond Shear Connectors under Lateral Loading

被引:11
作者
Kim, Young-Ho [1 ]
Kang, Jae-Yoon [2 ]
Kim, Sang-Ho [3 ]
Kim, Dae-Jin [4 ]
机构
[1] Ji Seung Consultant Co Ltd, Inst R&D, Seoul 06128, South Korea
[2] Korea Inst Civil Engn & Bldg Technol, Goyang 10223, South Korea
[3] Hyundai Engn Co Ltd, Seoul 03058, South Korea
[4] Kyung Hee Univ, Dept Architectural Engn, Yongin 17104, South Korea
来源
Applied Sciences-Basel | 2016年 / 6卷 / 11期
基金
新加坡国家研究基金会;
关键词
steel pipe pile; perfobond connector; concrete footing; pile cap; bending resistance; CONCRETE; BEHAVIOR;
D O I
10.3390/app6110317
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The conventional strengthening strategy on the connection between the steel pile cap and reinforced concrete footing requires a series of complicated processes such as the distribution of reinforcing bars, their anchorage into concrete, and the usage of shear keys. This study investigates the structural performance of steel pile caps strengthened with newly proposed perfobond shear connectors subjected to lateral loading. Test parameters include the type of perfobond shear connectors, infilled concrete depth, and the number of L-shaped steel plates. The applied load versus deformation curve is plotted for all specimens, and their failure modes are identified. The effects of the test parameters on the peak load are examined in this work. From the results of this study, it can be confirmed that the proposed perfobond shear connector can be utilized as an alternative to the conventional steel pile cap strengthening method using steel rebars.
引用
收藏
页数:11
相关论文
共 12 条
  • [1] American Society for Testing and Materials International, 2012, A37013A ASTM INT
  • [2] American Society for Testing and Materials International, 2011, C39C39M11 ASTM INT
  • [3] [Anonymous], 1987, ENG FDN C HENN NEW H
  • [4] Joen PamH., 1990, PCI J, V35, P42, DOI 10.15554/pcij.11011990.42.61
  • [5] Experimental investigation on behaviour of steel-concrete composite bridge decks with perfobond ribs
    Kim, HY
    Jeong, YJ
    [J]. JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2006, 62 (05) : 463 - 471
  • [6] Experimental shear resistance evaluation of Y-type perfobond rib shear connector
    Kim, Sang-Hyo
    Choi, Kyu-Tae
    Park, Se-Jun
    Park, Seung-Min
    Lung, Chi-Young
    [J]. JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2013, 82 : 1 - 18
  • [7] Pull-Out Resistance Capacity of a New Perfobond Shear Connector for Steel Pile Cap Strengthening
    Kim, Young-Ho
    Kang, Jae-Yoon
    Koo, Hyun-Bon
    Kim, Dae-Jin
    [J]. ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2016, 2016
  • [8] Korea Rail Network Authority, 2013, DES COD RAILW BRIDG
  • [9] A PARAMETRIC STUDY OF PERFOBOND RIB SHEAR CONNECTORS
    OGUEJIOFOR, EC
    HOSAIN, MU
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 1994, 21 (04) : 614 - 625
  • [10] Shama AA, 2002, ACI STRUCT J, V99, P51