The Impact of Industrial Context on Procurement, Management and Development of Harvesting Services: A Comparison of Two Swedish Forest Owners Associations

被引:24
作者
Erlandsson, Emanuel [1 ]
机构
[1] Swedish Univ Agr Sci, Dept Forest Biomat & Technol, S-90183 Umea, Sweden
关键词
logging; contractor; wood procurement; operations management; function modeling; STRATEGIES; SWEDEN; FIRM;
D O I
10.3390/f4041171
中图分类号
S7 [林业];
学科分类号
0829 ; 0907 ;
摘要
Increasing demands to harvesting production and quality require improved management practices. This study's purpose was to analyze the impact of industrial context on procurement, management, and development of harvesting services. Using interviews, functions were modeled at two forest owners associations (FOAs) with outsourced harvesting services. One FOA had its own sawmills, requiring frequent harvesting production adjustments to meet varying volume demand in the short-term. The long-term uncertainty was however low because of good visibility of future demand (>6 months). The other FOA did not own mills and produced wood according to fixed six-month delivery contracts. This meant few short-term production adjustments, but long-term uncertainty due to low visibility of future demand. Demand uncertainty resulted in corresponding needs for harvesting capacity flexibility. This could have been met by a corresponding proportion of short-term contracts for capacity. In this study, however, a large proportion (>90%) of long-term contracts was found, motivated by a perceived contractor shortage. It was also noted that although contractor investment cycles (4-6 years) matched the FOAs' strategic horizons (3-5 years), contractors' investment plans were not considered in the FOAs' strategic planning. The study concludes with a characterization of different FOA contexts and their corresponding needs for capacity flexibility.
引用
收藏
页码:1171 / 1198
页数:28
相关论文
共 47 条
[1]  
Ager B, 2012, SKOGSARBETETS RATION
[2]  
Andren M., 2004, SILVA CARELICA, V45, P150
[3]  
[Anonymous], 1993, INT DEF FUNCT MOD ID
[4]  
[Anonymous], SWED STAT YB FOR 201
[5]  
Arlinger J., 2006, STANDARD SKOTARRAPPO
[6]  
Arlinger J., 2011, NYA MOJLIGHETER STAN
[7]  
Arnold U., 2000, European Journal of Purchasing Supply Management, V6, P23, DOI DOI 10.1016/S0969-7012(99)00028-3
[8]  
Audy J.-F., 2012, Report CIRRELT
[9]  
Bergkvist I., 2010, TVASKIFT BILLIGAST L
[10]  
Bergquist E., 2009, VARFOR LAMNAR SKOGSM