共 50 条
- [22] A discrete numerical approach for modelling face stability in slurry shield tunnelling GEOMECHANICS AND GEOTECHNICS: FROM MICRO TO MACRO, VOLS 1 AND 2, 2011, : 627 - 633
- [24] Metro Munich, line 1, lot 5, west, slurry-shield on progress TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 555 - 559
- [25] Algorithm for predicting slurry penetration distance in front of slurry shield tunnel face Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2021, 55 (12): : 2234 - 2242
- [27] Criteria for Cutting Head Clogging Occurrence during Slurry Shield Tunneling APPLIED SCIENCES-BASEL, 2022, 12 (03):