Key Practice Indicators of Team Integration in Construction Projects: A Review

被引:0
作者
Ibrahim, Che Khairil Che [1 ]
Costello, Seosamh Benedict [1 ]
Wilkinson, Suzanne [1 ]
机构
[1] Univ Auckland, Dept Civil & Environm Engn, Auckland, New Zealand
来源
CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011 | 2011年 / 15卷
关键词
Key Practice Indicators; Team Integration; Construction Projects; SUPPLY CHAIN INTEGRATION; FRAMEWORK;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper conducts a review of the literature to identify key practice indicators of team integration in construction projects. The review identified six key practice indicators which are considered vital to team integration within construction projects. These indicators can be used in setting a benchmark for measuring team integration practice in construction projects and hence enhance a team's competitiveness and effectiveness.
引用
收藏
页码:230 / 235
页数:6
相关论文
共 27 条
  • [11] Egan J., 2002, ACCELERATING CHANGE
  • [12] Dynamic Knowledge-Based Process Integration Portal for Collaborative Construction
    El-Gohary, Nora M.
    El-Diraby, Tamer E.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2010, 136 (03) : 316 - 328
  • [13] An integrated framework for concurrent life-cycle design and construction
    Evbuomwan, NFO
    Anumba, CJ
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 1998, 29 (7-9) : 587 - 597
  • [14] The influence of a collaborative procurement approach using integrated design in construction on project team performance
    Forgues, Daniel
    Koskela, Lauri
    [J]. INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2009, 2 (03) : 370 - 385
  • [15] Jorgensen Bo, 2009, Construction Innovation, V9, P225, DOI 10.1108/14714170910950849
  • [16] Kajewski S., 2003, 2001008C04 CRCCI QUE
  • [17] Best practices for integrating the concurrent engineering environment into multipartner project management
    Karlsson, Mary
    Lakka, Antti
    Sulankivi, Kristiina
    Hanna, Awad S.
    Thompson, Benjamin P.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2008, 134 (04): : 289 - 299
  • [18] Latham M., 1994, CONSTRUCTING TEAM JO
  • [19] Love P.E. D., 1998, INT J OFPROJECT MANA, V16, P375, DOI [10.1016/S0263-7863(97)00066-5, DOI 10.1016/S0263-7863(97)00066-5]
  • [20] Moore D.R., 1999, Team Performance Management, V5, P212, DOI DOI 10.1108/13527599910304886