Optimization of connecting two communication networks subject to a reliability constraint

被引:1
|
作者
Zhao, LC
Shao, FM
机构
关键词
D O I
10.1016/S0026-2714(96)00075-3
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper considers optimization of two networks with a reliability constraint The objective is to find some links to connect two networks, at a minimal cost, under the constraint that the system reliability of the resultant network is not less than a given level. A decomposition method based on branch and bound is used for solving the problem. In order to speed up the solution procedure, an upper bound on system reliability in terms of node degrees is applied. In particular, when the threshold P-0 is large enough, a new algorithm, the cut tree algorithm, can more effectively give an optimal solution. Copyright (C) 1966 Elsevier Science Ltd.
引用
收藏
页码:629 / 633
页数:5
相关论文
共 50 条
  • [31] Optimization in temporal qualitative constraint networks
    Condotta, Jean-Francois
    Kaci, Souhila
    Salhi, Yakoub
    ACTA INFORMATICA, 2016, 53 (02) : 149 - 170
  • [32] STOCHASTIC NETWORKS FOR CONSTRAINT SATISFACTION AND OPTIMIZATION
    SASTRY, PS
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 1990, 15 : 251 - 262
  • [33] Optimization in temporal qualitative constraint networks
    Jean-François Condotta
    Souhila Kaci
    Yakoub Salhi
    Acta Informatica, 2016, 53 : 149 - 170
  • [34] RELIABILITY OF A 3-STATE SYSTEM SUBJECT TO FLOW QUANTITY CONSTRAINT
    YUGE, T
    SASAKI, M
    YANAGI, S
    IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, 1994, E77A (01) : 129 - 133
  • [35] A Two-Phase Approach for Reliability-Redundancy Optimization of a Communication Satellite
    Tetik, Taha
    Das, G. Sena
    Birgoren, Burak
    GAZI UNIVERSITY JOURNAL OF SCIENCE, 2024, 37 (01): : 310 - 324
  • [36] TWO-TERMINAL RELIABILITY ANALYSIS FOR MULTI-PHASE COMMUNICATION NETWORKS
    Lu, Ji-Min
    Innal, Fares
    Wu, Xiao-Yue
    Liu, Yiliu
    Lundteigen, Mary Ann
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2016, 18 (03): : 418 - 427
  • [37] Connecting Networks of Toys and Smartphones with Visible Light Communication
    Corbellini, Giorgio
    Aksit, Kaan
    Schmid, Stefan
    Mangold, Stefan
    Gross, Thomas R.
    IEEE COMMUNICATIONS MAGAZINE, 2014, 52 (07) : 72 - 78
  • [38] OPTIMALITY CONDITIONS FOR SHAPE AND TOPOLOGY OPTIMIZATION SUBJECT TO A CONE CONSTRAINT
    Amstutz, Samuel
    Ciligot-Travain, Marc
    SIAM JOURNAL ON CONTROL AND OPTIMIZATION, 2010, 48 (06) : 4056 - 4077
  • [39] OPTIMIZATION OF MAINTENANCE FACILITY FOR A REPAIRABLE SYSTEM SUBJECT TO AVAILABILITY CONSTRAINT
    SHETTY, BN
    SEKHON, GS
    CHAWLA, OP
    KURIEN, KC
    MICROELECTRONICS AND RELIABILITY, 1988, 28 (06): : 893 - 896
  • [40] A PENALTY METHOD FOR TOPOLOGY OPTIMIZATION SUBJECT TO A POINTWISE STATE CONSTRAINT
    Amstutz, Samuel
    ESAIM-CONTROL OPTIMISATION AND CALCULUS OF VARIATIONS, 2010, 16 (03) : 523 - 544