PROBABILISTIC SAFETY ASSESSMENT TO THE 1000 MWE NPP DURING SHUTDOWN CONDITIONS

被引:0
作者
Lin, Li [1 ]
Bo, Zhao [1 ]
机构
[1] China Nucl Power Engn Co Ltd, Beijing, Peoples R China
来源
PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 2 | 2011年
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
For nuclear power plant, probabilistic safety assessment (PSA) is an effective tool for risk evaluating, risk recognizing and risk managing. This paper initiate a study focused on shutdown safety for NPP as well as the related PSA approaches. Especially, a PSA preliminary analysis and estimation on shutdown operation to the 1000 MWe NPP are performed. The first part of this thesis presents the methods used in the classification of plant operation state (PUS), the identification of initiating event and the quantification of initiating event frequency. The second part centers on configuration of shutdown model used in PSA. Based on the design and operation features during shutdown conditions of NPPs, event trees for the shutdown model are constructed and Human Reliability Analysis (HRA) is performed. The last part is the quantification of the integrated shutdown model by means of Risk Spectrum software. System analysis is based on FuQing nuclear power plant PSA report. Component failure data and initiating event frequencies are largely based on EPS900 or NUREG./CR-6144. Overall point estimation of core damage frequency (CDF) during shutdown is assessed; the most important risk contributors of plant operational states, the dominant initiating events and their contribution to CDF are described respectively.
引用
收藏
页码:431 / 445
页数:15
相关论文
共 50 条
[11]   RESEARCH ON DTS ANALYSIS METHOD FOR 1000MWE PWR NPP [J].
Zhang Yubin .
PROCEEDINGS OF 2021 28TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING (ICONE28), VOL 1, 2021,
[12]   Probabilistic Safety Assessment of the French PWR 900 MWe series - Results and insights [J].
Corenwinder, F ;
Bertrand, V ;
Dupuy, P ;
Gomane, C ;
Mattei, JM ;
Pichereau, F .
PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, :1-5
[13]   Shutdown Probabilistic Safety Assessment - A Case Study for the Pressurized Water Reactor [J].
Cepin, Marko ;
Prosen, Rudolf .
25TH INTERNATIONAL CONFERENCE NUCLEAR ENERGY FOR NEW EUROPE, (NENE 2016), 2016,
[14]   Analysis on containment depressurization under severe accidents for a Chinese 1000 MWe NPP [J].
Yuan, K. ;
Qie, W. Q. ;
Tong, L. L. ;
Cao, X. W. .
PROGRESS IN NUCLEAR ENERGY, 2013, 65 :8-14
[15]   OUTCOMES OF AN INTERNATIONAL INITIATIVE FOR HARMONIZATION OF LOW POWER AND SHUTDOWN PROBABILISTIC SAFETY ASSESSMENT [J].
Manna, Giustino ;
Kuzmina, Irma ;
Holy, Jaroslav .
NUCLEAR TECHNOLOGY & RADIATION PROTECTION, 2010, 25 (03) :222-228
[16]   Human Factor Importance In Probabilistic Safety Assessment - Shutdown Versus Full Power [J].
Antoncic, Mitja ;
Cepin, Marko .
26TH INTERNATIONAL CONFERENCE NUCLEAR ENERGY FOR NEW EUROPE (NENE 2017), 2017,
[17]   Enhancing Tehran Research Reactor safety through a Second Shutdown System: A probabilistic safety assessment [J].
Boustani, Ehsan ;
Khakshournia, Samad .
PROGRESS IN NUCLEAR ENERGY, 2017, 100 :380-388
[18]   Stepwise Probabilistic and Deterministic Safety Analyses of Loss of Coolant Accident under Shutdown Conditions [J].
Park, Jong Woon ;
Jerng, Dong-Wook .
ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2014, 59 (06) :364-+
[19]   Contribution of Human Reliability in Power Probabilistic Safety Assessment Models Versus Shutdown Models [J].
Cepin, Marko .
ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART B-MECHANICAL ENGINEERING, 2020, 6 (01)
[20]   APPLICATION OF A PROCESS FLOW MODEL TO A SHUTDOWN NUCLEAR-PLANT PROBABILISTIC SAFETY ASSESSMENT [J].
BLEY, DC ;
REULAND, WB .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1987, 17 (04) :241-253