Investigation of surrogate measures of robustness for project scheduling problems

被引:18
作者
Zahid, Taiba [1 ]
Agha, Mujtaba Hassan [2 ]
Schmid, Thorsten [3 ]
机构
[1] Capital Univ Sci & Technol, Dept Mech Engn, Islamabad, Pakistan
[2] NUST, NBS, Islamabad, Pakistan
[3] Tech Univ TU Dresden, Dept Mech Engn, Dresden, Germany
关键词
Robustness; Scheduling; Surrogate measures; Multi-pass heuristics; Regression; Simulation; PROCESSING TIME; OPTIMIZATION;
D O I
10.1016/j.cie.2019.01.041
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Uncertainties in systems and data necessitate plans that are flexible enough to be applicable in a real-time production environment. Such plans find a compromise between optimality and flexibility, frequently termed as robustness. Time is a well-known criterion for evaluating optimality of a schedule, but in the case of robustness, additional surrogate measures are required. These surrogate measures of robustness aid in identifying proactive schedules, which can provide flexible yet efficient plans with minimum redundancy. This study suggests new robustness measures and proposes a test bench for the systematic analysis of such criteria. Regression analysis was used for comparison of the suggested measures with traditional slack-based measures. The results show that float index (a novel measure) has a strong correlation with tardiness and is an effective measure to determine the robust nature of any schedule.
引用
收藏
页码:220 / 227
页数:8
相关论文
共 48 条
[1]   A bi-objective model for robust resource-constrained project scheduling [J].
Al-Fawzan, MA ;
Haouari, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) :175-187
[2]   Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms [J].
Alcaraz, J ;
Maroto, C ;
Ruiz, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) :614-626
[3]  
[Anonymous], 2008, NEWTOWN SQUARE
[4]  
Biliolakar V. S., 2012, INT J COMPUTER APPL, V60, P36
[5]   A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling [J].
Chtourou, Hedi ;
Haouari, Mohamed .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 55 (01) :183-194
[6]  
Corder G.W., 2014, NONPARAMETRIC STAT S, V2nd
[7]  
Daniel W. W., 1990, Applied Nonparametric Statistics, V2nd, P358
[8]   ROBUST SCHEDULING TO HEDGE AGAINST PROCESSING TIME UNCERTAINTY IN SINGLE-STAGE PRODUCTION [J].
DANIELS, RL ;
KOUVELIS, P .
MANAGEMENT SCIENCE, 1995, 41 (02) :363-376
[9]  
Davenport A., 2000, A survey of techniques for scheduling with uncertainty
[10]  
Demeulemeester E., 2007, J SCHEDULING, V6, P1738