Diagnose the Causes of Cost Deviation in Highway Construction Projects by Using Root Cause Analysis Techniques

被引:11
作者
Al-Zwainy, Faiq M. S. [1 ]
Mezher, Reem Amer [2 ]
机构
[1] Al Nahrain Univ, Dept Civil Engn, Coll Engn, Baghdad, Iraq
[2] Univ Technol Baghdad, Bldg & Construct Engn Dept, Baghdad, Iraq
关键词
Highway projects; Cost deviation; Root cause analysis techniques; Fishbone diagram; Pareto diagram; 5-Why analysis;
D O I
10.1007/s13369-017-2850-2
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The root cause analysis techniques are a good choice to be adopted to diagnose the root causes of cost deviation in highway projects. Many root cause analysis tools have emerged from the literature as generic standards for identifying root causes such as Fishbone diagram, Pareto diagram, and the 5-Why analysis. This study diagnosed twenty causes of cost deviation in highway projects in Republic of Iraq which they divided into three main groups (planning causes, designing causes, and execution causes). Pareto analysis showed that eleven causes out of twenty causes represent the most important causes of cost deviation, these eleven causes had been filtered by 5-Why analysis, this analysis concluded that the unavailability of enough information about the project is a root cause for planning causes group, while the clarity lack of the owner requirements is a root cause for designing causes group and finally, the poor efficiency of the administrative staff is a root cause for execution causes group.
引用
收藏
页码:2001 / 2012
页数:12
相关论文
共 15 条
  • [1] Identifying root causes of construction accidents
    Abdelhamid, TS
    Everett, JG
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (01): : 52 - 60
  • [2] Al-Zwainy F., 2015, INT J ENG MANAG RES, V05, P362
  • [3] Al-Zwainy F., 2013, Open Journal of Civil Engineering, V3, P127, DOI [10.4236/ojce.2013.33015, DOI 10.4236/OJCE.2013.33015]
  • [4] AL-Zwainy F.M., 2017, INDIAN J SCI TECHNOL, V10, P1, DOI DOI 10.17485/ijst/2017/v10i20/108567
  • [5] Al-Zwainy F. M. S., 2016, INT J APPL ENG RES, V11, P2494
  • [6] AlZwainy F. M., 2016, RES J APPL SCI ENG T, V13, P843
  • [7] Geoff V., 2008, MINI GUIDE ROOT CAUS
  • [8] Identifying root causes of construction injuries
    Hinze, J
    Pedersen, C
    Fredley, J
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (01): : 67 - 71
  • [9] Construction delays in Hong Kong civil engineering projects
    Lo, Tommy Y.
    Fung, Ivan W. H.
    Tung, Karen C. F.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (06) : 636 - 649
  • [10] Application of root cause analysis in improvement of product quality and productivity
    Mahto, Dalgobind
    Kumar, Anjani
    [J]. JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2008, 1 (02): : 16 - 53