An interval type-2 fuzzy MCDM model for work package subcontractor prequalification

被引:14
作者
Afshar, Mohammad Reza [1 ]
Shahhosseini, Vahid [1 ]
Sebt, Mohammad Hassan [1 ]
机构
[1] Amirkabir Univ Technol, Dept Civil & Environm Engn, Tehran 158754413, Iran
关键词
Work packages subcontractors prequalification; Shannon entropy weight; Technique for order performance by similarity to ideal solutions; Interval Type-2 Fuzzy Set; SELECTION; CONTRACTOR; AHP; FRAMEWORK; CRITERIA; IMPACT;
D O I
10.1007/s00500-020-05173-3
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The inherent role of the Main Contractors (MCs) and their responsibility to employers force them to consider an appropriate mechanism for evaluating the subcontractors (SCs). The past few decades witnessed the gradual prevalence of fuzzy set theory in different industries. The construction industry was not an exception either. It is in use now for SCs prequalification thanks to its competence in covering the flaws underlying the SC selection methods. Most previous researches employed Type-1 Fuzzy Sets (T1FSs) in SCs prequalification models. But, the result of the applying TIFSs to solve a SC prequalification could be simply misleading because it is principally a group (Multi-Criteria Decision Making) MCDM problem. An important limitation of T1FS assures the fact that it can handle the decision-making problem of only one person because its membership function is crisp, relying on his subjective viewpoint, and deterring it from revealing differing views among the experts. We aim to introduce a novel SCs prequalification method using Interval Type-2 Fuzzy Sets (IT2FSs) in a bid to rectify the linguistic flaws as well as differences of the experts' views. Therefore, an integration of two methods, namely "Shannon Entropy Weight" and "Technique for Order Performance by Similarity to Ideal Solutions," is used under IT2FS for solving the SC prequalification problem. In addition, a real case is considered to demonstrate the effectiveness of the proposed method.
引用
收藏
页码:635 / 648
页数:14
相关论文
共 37 条
[1]   A Decision-Making Framework for Subcontractor Selection in Construction Projects [J].
Abbasianjahromi, Hamidreza ;
Sepehri, Mehran ;
Abbasi, Omid .
ENGINEERING MANAGEMENT JOURNAL, 2018, 30 (02) :141-152
[2]   A FRAMEWORK FOR SUBCONTRACTOR SELECTION IN THE CONSTRUCTION INDUSTRY [J].
Abbasianjahromi, Hamidreza ;
Rajaie, Hossein ;
Shakeri, Eqbal .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2013, 19 (02) :158-168
[3]   Ascertaining the impact of contractors pre-qualification criteria on project success criteria [J].
Acheamfour, Victor Karikari ;
Kissi, Ernest ;
Adjei-Kumi, Theophilus .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (04) :618-632
[4]   A type-2 fuzzy set model for contractor prequalification [J].
Afshar, Mohammad Reza ;
Alipouri, Yagub ;
Sebt, Mohammad Hassan ;
Chan, Weng Tat .
AUTOMATION IN CONSTRUCTION, 2017, 84 :356-366
[5]   The impact of contractors' prequalification on construction project delivery in Nigeria [J].
Aje, Isaac .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (02) :159-+
[6]  
Albino V., 1998, International Journal of Project Management, V16, P9, DOI DOI 10.1061/(ASCE)CO.1943-7862.0000184
[7]   Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES) [J].
Arslan, Gokhan ;
Kivrak, Serkan ;
Birgonul, M. Talat ;
Dikmen, Irem .
AUTOMATION IN CONSTRUCTION, 2008, 17 (04) :480-488
[8]   Development of an interval type-2 fuzzy sets based hierarchical MADM model by combining DEMATEL and TOPSIS [J].
Baykasoglu, Adil ;
Golcuk, Ilker .
EXPERT SYSTEMS WITH APPLICATIONS, 2017, 70 :37-51
[9]   Evaluation and selecting the contractor in bidding with incomplete information using MCGDM method [J].
Birjandi, Alireza Komeili ;
Akhyani, Fatemeh ;
Sheikh, Reza ;
Sana, Shib Sankar .
SOFT COMPUTING, 2019, 23 (20) :10569-10585
[10]   An interval type-2 fuzzy AHP and TOPSIS methods for decision-making problems in maritime transportation engineering: The case of ship loader [J].
Celik, Erkan ;
Akyuz, Emre .
OCEAN ENGINEERING, 2018, 155 :371-381