Cell Layout of Aircraft Assembly System Based on Sequence Pair

被引:0
作者
Xu, Jiajia [1 ]
Li, Yuan [1 ]
Yu, Jianfeng [1 ]
Zhang, Jie [1 ]
机构
[1] Northwestern Polytech Univ, Minist Educ, Key Lab Contemporary Design & Integrated Mfg Tech, Xian 710072, Peoples R China
来源
FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE III, PTS 1 AND 2 | 2013年 / 271-272卷
关键词
Aircraft assembly system; Cell layout; Sequence pair; Simulated annealing; DESIGN;
D O I
10.4028/www.scientific.net/AMM.271-272.801
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper aims to investigate the cell layout problem of aircraft assembly system. A mathematical model for this problem is proposed, taking into account the integration design of cell layout and logistics network. The means of logistics transportation are divided into horizontal transportation and space transportation, meanwhile, the logistics transportation route is calculated. Based on sequence pair, the presentation of solution structure for cell layout is put forward, and the solution structure is solved using simulated annealing algorithm. This method is applied successfully to the assembly cell layout of the fuselage-wing assembly system for a giant aircraft, and the result shows its feasibility and effectiveness.
引用
收藏
页码:801 / +
页数:2
相关论文
共 50 条
  • [21] Mixed Reality-based Interactive Technology for Aircraft Cabin Assembly
    Li Shiqi
    Peng Tao
    Wang Junfeng
    Xu Chi
    CHINESE JOURNAL OF MECHANICAL ENGINEERING, 2009, 22 (03) : 403 - 409
  • [22] Mean Value-Based Parallel Collaborative Optimization Method for Modular Aircraft Structural Layout
    Xu, Chao
    Yao, Weixing
    Zhou, Danfa
    AEROSPACE, 2022, 9 (10)
  • [23] A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on TOPSIS method
    Ahi, Arshia
    Aryanezhad, Mir. B.
    Ashtiani, Behzad
    Makui, Ahmad
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (05) : 1478 - 1496
  • [24] Kinematic modeling and base frame calibration of a dual-machine-based drilling and riveting system for aircraft panel assembly
    Zhao, Dan
    Bi, Yunbo
    Ke, Yinglin
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 94 (5-8) : 1873 - 1884
  • [25] SLASH: A deterministic block placement algorithm based on Sequence-Pair
    Takashima, Y
    Murata, H
    2000 IEEE ASIA-PACIFIC CONFERENCE ON CIRCUITS AND SYSTEMS: ELECTRONIC COMMUNICATION SYSTEMS, 2000, : 825 - 828
  • [26] A new approach for determining optimum number of cell, cell formation and intra-machine cell layout with considering operation sequence
    Raja, Shanmuganantham
    Vignesh, Krishnan
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 2024, 238 (06) : 2770 - 2781
  • [27] A FRAMEWORK FOR RESCHEDULING A FIXED-LAYOUT ASSEMBLY SYSTEM USING DISCRETE-EVENT SIMULATION
    Billiet, Harold
    Stark, Rainer
    2022 WINTER SIMULATION CONFERENCE (WSC), 2022, : 1762 - 1771
  • [28] A timing-driven block placer based on sequence pair model
    Huang, G
    Hong, XL
    Qiao, CG
    Cai, YC
    PROCEEDINGS OF ASP-DAC '99: ASIA AND SOUTH PACIFIC DESIGN AUTOMATION CONFERENCE 1999, 1999, : 249 - 252
  • [29] Application of assembly system partial units for the development of intelligent assembly cell
    Ruzarovsky, Roman
    Danisova, Nina
    Velisek, Karol
    III CENTRAL EUROPEAN CONFERENCE ON LOGISTICS, 2013, 309 : 3 - 11
  • [30] The use of a complexity model to facilitate in the selection of a fuel cell assembly sequence
    Ahmad, Mussawar
    Alkan, Bugra
    Ahmad, Bilal
    Vera, Daniel
    Harrison, Robert
    Meredith, James
    Bindel, Axel
    6TH CIRP CONFERENCE ON ASSEMBLY TECHNOLOGIES AND SYSTEMS (CATS), 2016, 44 : 169 - 174