A stochastic multi-objective closed-loop global supply chain concerning waste management: a case study of the tire industry

被引:22
作者
Ghasemzadeh, Zahra [1 ]
Sadeghieh, Ahmad [1 ]
Shishebori, Davood [1 ]
机构
[1] Yazd Univ, Dept Ind Engn, Yazd, Iran
关键词
Closed-loop supply chain; Network design; Multi-objective; Tire; Shortage; Global factors; Eco-indicator; 99; Waste management; Uncertainty; EPSILON-CONSTRAINT METHOD; NETWORK; LOCATION; DESIGN; SYSTEM; MODEL;
D O I
10.1007/s10668-020-00847-2
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Today, growth in the population and the use of vehicles have led to a growth in the production of waste tires and subsequently the creation of environmental concerns. Thus, choosing common strategies (such as retreading, recycling, burning, and disposal) to deal with these wastes and improve environmental conditions has become one of the most significant concerns of today's industries. In this study, a mixed-integer linear programming model has been used to develop a stochastic closed-loop supply chain network design (SCND). The proposed formulation has two objectives: (i) minimizing Eco-indicator 99 and (ii) maximizing profit in a multi-product, multi-echelon, and multi-period problem for tires. It is implemented in a practical case study in tire production industry. Also, uncertain parameters such as the return rate of products, demand, and the percentage of tire material provided by external suppliers are considered as possible scenarios. The improved version of the augmented e-constraint, named AUGMECON2, is applied to solve the proposed problem. Finally, comprehensive sensitivity analysis is carried out to measure the efficiency. Obtained results represent that concerning global factors, an optimal closed-loop SCND can be very different and the problem is sensitive to the customs duty rate and exchange rate parameters. Besides, without considering the limitations of supplying raw materials by external suppliers, profits can increase by about 12%.
引用
收藏
页码:5794 / 5821
页数:28
相关论文
共 33 条
  • [21] Panagiotidou S., 2005, Managing closed-loop supply chains, P183, DOI DOI 10.1007/3-540-27251-8_17
  • [22] Integrated forward and reverse supply chain: A tire case study
    Pedram, Ali
    Bin Yusoff, Nukman
    Udoncy, Olugu Ezutah
    Mahat, Abu Bakar
    Pedram, Payam
    Babalola, Ayo
    [J]. WASTE MANAGEMENT, 2017, 60 : 460 - 470
  • [23] Environmental supply chain network design using multi-objective fuzzy mathematical programming
    Pishvaee, Mir Saman
    Razmi, Jafar
    [J]. APPLIED MATHEMATICAL MODELLING, 2012, 36 (08) : 3433 - 3446
  • [24] Rezaei S, 2019, DEV SUSTAINABILITY E, P1
  • [25] Sustainable tire closed-loop supply chain network design: Hybrid metaheuristic algorithms for large-scale networks
    Sahebjamnia, Navid
    Fathollahi-Fard, Amir Mohammad
    Hajiaghaei-Keshteli, Mostafa
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 196 : 273 - 296
  • [26] A multi-echelon reverse logistics network design for product recovery-a case of truck tire remanufacturing
    Sasikumar, P.
    Kannan, Govindan
    Haq, A. Noorul
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (9-12) : 1223 - 1234
  • [27] Multi-objective deterministic and robust models for selecting optimal pipe materials in water distribution system planning under cost, health, and environmental perspectives
    Shakhsi-Niaei, Majid
    Esfandarani, Mitra Salehi
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 207 : 951 - 960
  • [28] Barriers of a closed-loop cartridge remanufacturing supply chain for urban waste recovery governance in China
    Shi, Jing
    Zhou, Junjie
    Zhu, Qinghua
    [J]. JOURNAL OF CLEANER PRODUCTION, 2019, 212 : 1544 - 1553
  • [29] Designing an environmentally conscious tire closed-loop supply chain network with multiple recovery options using interactive fuzzy goal programming
    Subulan, Kemal
    Tasan, A. Serdar
    Baykasoglu, Adil
    [J]. APPLIED MATHEMATICAL MODELLING, 2015, 39 (09) : 2661 - 2702
  • [30] Tanzadeh G., 2012, 1 INT C 6 NAT C WAST, V6, P18