Tool requirements planning in a flexible manufacturing system with an automatic tool transporter

被引:3
|
作者
Kim, YD [1 ]
Lee, GC
Choi, SK
Lim, SK
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
[2] Elect & Telecommun Res Inst, Informat Support Div, Taejon 305350, South Korea
[3] PricewaterhouseCoopers, Seoul 135798, South Korea
来源
关键词
flexible manufacturing systems; loading and scheduling; tool movement systems; tool requirements planning;
D O I
10.1109/70.975993
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
We consider a tool requirements planning problem in a flexible manufacturing system with an automatic tool transporter. The problem considered here is that of determining the number of tool copies of each tool type with the objective of minimizing total tardiness of orders with distinct due dates for a given budget for tool purchase. For the problem, several heuristic algorithms are developed using greedy search methods and simulation. In the heuristic algorithms, the numbers of tool copies for certain tool types are increased until they cannot be increased any more because of the budget limit. Simulation results are used to determine search directions or to select tool types of which the numbers of copies are to be increased. Computational experiments are performed on randomly generated test problems and results show that a good tool requirements plan can be obtained with the heuristic algorithms in a reasonable amount of computation time.
引用
收藏
页码:795 / 804
页数:10
相关论文
共 50 条
  • [31] Scheduling of the optimal tool replacement times in a flexible manufacturing system
    Liu, PH
    Makis, V
    Jardine, AKS
    IIE TRANSACTIONS, 2001, 33 (06) : 487 - 495
  • [32] EVALUATING THE EFFECT OF TOOL MANAGEMENT ON FLEXIBLE MANUFACTURING SYSTEM PERFORMANCE
    TETZLAFF, UAW
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (04) : 877 - 892
  • [33] Selection of cutting conditions and tool flow in flexible manufacturing system
    Cus, F
    Balic, J
    JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2001, 118 (1-3) : 485 - 489
  • [34] Priority-based tool allocation in a flexible manufacturing system
    Mukhopadhyay, SK
    Sahu, SK
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (07) : 1995 - 2018
  • [35] Simulation as a tool for planning a material delivery system to manufacturing lines
    Costa, Bruno
    Dias, Luis S.
    Oliveira, Jose A.
    Pereira, Guilherme
    IEMC - EUROPE 2008: INTERNATIONAL ENGINEERING MANAGEMENT CONFERENCE, EUROPE, CONFERENCE PROCEEDINGS: MANAGING ENGINEERING, TECHNOLOGY AND INNOVATION FOR GROWTH, 2008, : 439 - 443
  • [36] A general framework for automatic CAD-guided tool planning for surface manufacturing
    Chen, HP
    Xi, N
    Sheng, WH
    Chen, YF
    Roche, A
    Dahl, J
    2003 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-3, PROCEEDINGS, 2003, : 3504 - 3509
  • [37] BAL Tool in Flexible Manufacturing Systems
    Perez Leandrez, Diego
    Carmen Ruiz, M.
    Jose Pardo, J.
    Cazorla, Diego
    ALGEBRAIC METHODOLOGY AND SOFTWARE TECHNOLOGY, 2011, 6486 : 209 - 215
  • [38] AUTOMATED TOOL MANAGEMENT IN FLEXIBLE MANUFACTURING
    ELMARAGHY, HA
    JOURNAL OF MANUFACTURING SYSTEMS, 1985, 4 (01) : 1 - 13
  • [39] An automatic tool for generating test cases from the system's requirements
    Ibrahim, Rosziati
    Saringat, Mohd Zainuri
    Ibrahim, Noraini
    Ismail, Noraida
    2007 CIT: 7TH IEEE INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION TECHNOLOGY, PROCEEDINGS, 2007, : 861 - 866
  • [40] Tool capacity planning in semiconductor manufacturing
    Çatay, B
    Erengüç, SS
    Vakharia, AJ
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (09) : 1349 - 1366