Planning performance based contracts considering reliability and uncertain system usage

被引:51
|
作者
Jin, T. [1 ]
Wang, P. [1 ]
机构
[1] Texas State Univ, Ingram Sch Engn, San Marcos, TX 78666 USA
关键词
reliability; service parts logistics; performance based contracting; performance-based outcome; post-production support; power by the hour; LATERAL TRANSSHIPMENTS; COMPONENT RELIABILITY; INVENTORY MODEL; MULTIECHELON; OPTIMIZATION; ALLOCATION; MULTIITEM;
D O I
10.1057/jors.2011.144
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates a novel quantitative approach for planning and contracting performance-based logistics in the presence of uncertain system usage. Our efforts focus on an integrated service delivery environment where the manufacturer develops capital-intensive systems and also provides aftersales support. We propose an analytical model to characterize system operational availability by comprehending five performance drivers: inherent failure rate, usage rate, spare parts inventory, repair time, and the fleet size. This analytical insight into the system performance allows the service supplier to minimize the total cost across system design, production, maintenance, and repair. Two contracting schemes are investigated under cost minimization and profit maximization schemes. For the first time in literature, reliability design and service parts logistics are seamlessly integrated into one decision support model for improving operational availability while lowering the lifecycle cost. Numerical examples are provided to demonstrate the applicability and the effectiveness of the proposed decision support tool. Journal of the Operational Research Society (2012) 63, 1467-1478. doi:10.1057/jors.2011.144 Published online 15 February 2012
引用
收藏
页码:1467 / 1478
页数:12
相关论文
共 50 条
  • [41] Optimal planning of structural performance monitoring based on reliability importance assessment
    Kim, Sunyong
    Frangopol, Dan M.
    PROBABILISTIC ENGINEERING MECHANICS, 2010, 25 (01) : 86 - 98
  • [42] Linear Formulations for Topology-Variable-Based Distribution System Reliability Assessment Considering Switching Interruptions
    Jooshaki, Mohammad
    Abbaspour, Ali
    Fotuhi-Firuzabad, Mahmud
    Munoz-Delgado, Gregorio
    Contreras, Javier
    Lehtonen, Matti
    Arroyo, Jose M.
    IEEE TRANSACTIONS ON SMART GRID, 2020, 11 (05) : 4032 - 4043
  • [43] Multi-objective active distribution networks expansion planning by scenario-based stochastic programming considering uncertain and random weight of network
    Xie, Shiwei
    Hu, Zhijian
    Zhou, Daming
    Li, Yan
    Kong, Shunfei
    Lin, Weiwei
    Zheng, Yunfei
    APPLIED ENERGY, 2018, 219 : 207 - 225
  • [44] Transmission Planning Considering Reliability and Economic Performances in A Deregulated Environment
    Gao, Zhixin
    Tan, Qingke
    Chen, Hongkun
    Qian, Yaoqi
    ICEMS 2008: PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON ELECTRICAL MACHINES AND SYSTEMS, VOLS 1- 8, 2008, : 4253 - +
  • [45] Planning and Operational Strategy of a Renewable Energy Microgrid Considering Reliability
    Kamboj, Anupam
    Chanana, Saurabh
    PROCEEDINGS OF THE FIRST IEEE INTERNATIONAL CONFERENCE ON POWER ELECTRONICS, INTELLIGENT CONTROL AND ENERGY SYSTEMS (ICPEICES 2016), 2016,
  • [46] Balancing Economy and Reliability of Integrated Community Energy System Planning Based on Reliability Marginal Cost
    Liu, Zeyu
    Hou, Kai
    Jia, Hongjie
    Zhu, Yushu
    Jiang, Qian
    Zhu, Lewei
    2021 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2021,
  • [47] System reliability of a sensor system considering the detectable area
    Noguchi, K
    Sasaki, M
    Yanagi, S
    Yuge, T
    ELECTRONICS AND COMMUNICATIONS IN JAPAN PART III-FUNDAMENTAL ELECTRONIC SCIENCE, 1997, 80 (11): : 64 - 72
  • [48] Optimal maintenance policy considering maintenance errors for systems operating under performance-based contracts
    Qiu, Qingan
    Cui, Lirong
    Shen, Jingyuan
    Yang, Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 147 - 155
  • [49] Reliability-based robust decentralized control strategy with uncertain parameters
    Ghaffari, A. H.
    Ghaffarzadeh, H.
    Hadidi, A.
    Rafiee, A.
    STRUCTURES, 2025, 71
  • [50] Performance Analysis of Cloud Service Considering Reliability
    Sun, Peng
    Wu, Demiao
    Qiu, Xiwei
    Luo, Liang
    Li, Hongwei
    2016 IEEE INTERNATIONAL CONFERENCE ON SOFTWARE QUALITY, RELIABILITY AND SECURITY COMPANION (QRS-C 2016), 2016, : 339 - 343