Planning performance based contracts considering reliability and uncertain system usage

被引:51
|
作者
Jin, T. [1 ]
Wang, P. [1 ]
机构
[1] Texas State Univ, Ingram Sch Engn, San Marcos, TX 78666 USA
关键词
reliability; service parts logistics; performance based contracting; performance-based outcome; post-production support; power by the hour; LATERAL TRANSSHIPMENTS; COMPONENT RELIABILITY; INVENTORY MODEL; MULTIECHELON; OPTIMIZATION; ALLOCATION; MULTIITEM;
D O I
10.1057/jors.2011.144
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates a novel quantitative approach for planning and contracting performance-based logistics in the presence of uncertain system usage. Our efforts focus on an integrated service delivery environment where the manufacturer develops capital-intensive systems and also provides aftersales support. We propose an analytical model to characterize system operational availability by comprehending five performance drivers: inherent failure rate, usage rate, spare parts inventory, repair time, and the fleet size. This analytical insight into the system performance allows the service supplier to minimize the total cost across system design, production, maintenance, and repair. Two contracting schemes are investigated under cost minimization and profit maximization schemes. For the first time in literature, reliability design and service parts logistics are seamlessly integrated into one decision support model for improving operational availability while lowering the lifecycle cost. Numerical examples are provided to demonstrate the applicability and the effectiveness of the proposed decision support tool. Journal of the Operational Research Society (2012) 63, 1467-1478. doi:10.1057/jors.2011.144 Published online 15 February 2012
引用
收藏
页码:1467 / 1478
页数:12
相关论文
共 50 条
  • [21] Considering cost and reliability in electrical and thermal distribution networks reinforcement planning
    Abbasi, Ali Reza
    Seifi, Ali Reza
    ENERGY, 2015, 84 : 25 - 35
  • [22] Optimal Reserve Grid Planning Considering Reliability
    La Fauci, Raffael
    Andersson, Gran
    Bader, Jurg
    2015 IEEE EINDHOVEN POWERTECH, 2015,
  • [23] Coastal Shuttle Tanker Scheduling Model Considering Inventory Cost and System Reliability
    Yang, Ang
    Wang, Rumeng
    Sun, Yuhui
    Chen, Kang
    Chen, Zigen
    IEEE ACCESS, 2020, 8 : 193935 - 193954
  • [24] Value-based distribution system reliability planning
    Chowdhury, AA
    Koval, DO
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1998, 34 (01) : 23 - 29
  • [25] Effective management of performance-based contracts for sustainment dominant systems
    Patra, Pradipta
    Kumar, U. Dinesh
    Nowicki, David R.
    Randall, Wesley S.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 208 : 369 - 382
  • [26] MILP Model of Electricity Distribution System Expansion Planning Considering Incentive Reliability Regulations
    Jooshaki, Mohammad
    Abbaspour, Ali
    Fotuhi-Firuzabad, Mahmud
    Moeini-Aghtaie, Moein
    Lehtonen, Matti
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2019, 34 (06) : 4300 - 4316
  • [27] Reliability analysis of excavator boom considering mixed uncertain variables
    Zhang, Yuru
    Liu, Xintian
    Yu, Xueguang
    Wang, Xu
    Wang, Xiaolan
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2021, 37 (04) : 1468 - 1483
  • [28] Integrated transmission expansion and PMU planning considering dynamic thermal rating in uncertain environment
    Madadi, Sajad
    Mohammadi-Ivatloo, Behnam
    Tohidi, Sajjad
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (10) : 1973 - 1984
  • [29] Reliability analysis in uncertain random system
    Meilin Wen
    Rui Kang
    Fuzzy Optimization and Decision Making, 2016, 15 : 491 - 506
  • [30] Reliability Analysis of Multiperformance Multistate System Considering Performance Conversion Process
    Ding, Yi
    Hu, Yishuang
    Lin, Yu
    Zeng, Zhiguo
    IEEE TRANSACTIONS ON RELIABILITY, 2022, 71 (01) : 2 - 15