Planning performance based contracts considering reliability and uncertain system usage

被引:51
|
作者
Jin, T. [1 ]
Wang, P. [1 ]
机构
[1] Texas State Univ, Ingram Sch Engn, San Marcos, TX 78666 USA
关键词
reliability; service parts logistics; performance based contracting; performance-based outcome; post-production support; power by the hour; LATERAL TRANSSHIPMENTS; COMPONENT RELIABILITY; INVENTORY MODEL; MULTIECHELON; OPTIMIZATION; ALLOCATION; MULTIITEM;
D O I
10.1057/jors.2011.144
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates a novel quantitative approach for planning and contracting performance-based logistics in the presence of uncertain system usage. Our efforts focus on an integrated service delivery environment where the manufacturer develops capital-intensive systems and also provides aftersales support. We propose an analytical model to characterize system operational availability by comprehending five performance drivers: inherent failure rate, usage rate, spare parts inventory, repair time, and the fleet size. This analytical insight into the system performance allows the service supplier to minimize the total cost across system design, production, maintenance, and repair. Two contracting schemes are investigated under cost minimization and profit maximization schemes. For the first time in literature, reliability design and service parts logistics are seamlessly integrated into one decision support model for improving operational availability while lowering the lifecycle cost. Numerical examples are provided to demonstrate the applicability and the effectiveness of the proposed decision support tool. Journal of the Operational Research Society (2012) 63, 1467-1478. doi:10.1057/jors.2011.144 Published online 15 February 2012
引用
收藏
页码:1467 / 1478
页数:12
相关论文
共 50 条
  • [1] System Reliability Optimization Considering Uncertain Future Operating Conditions and Usage Stresses
    Chatwattanasiri, Nida
    Coit, David W.
    Rodgers, Mark
    Song, Sanling
    PROCEEDINGS 18TH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY & QUALITY IN DESIGN, 2012, : 183 - 187
  • [2] Planning performance based contracts of repairable system using discrete event simulation
    Zhang, Xinghui
    Kang, Jianshe
    Zhao, Jinsong
    Teng, Hongzhi
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2014, 28 (10) : 3909 - 3915
  • [3] Hybrid PSO-TS Based Distribution System Expansion Planning for System Performance Improvement Considering Energy Management
    Alam, Md Shahin
    Arefifar, Seyed Ali
    IEEE ACCESS, 2020, 8 : 221599 - 221611
  • [4] Assessment of customer supply reliability in performance-based contracts
    Hamoud, G
    El-Nahas, I
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (04) : 1587 - 1593
  • [5] A SCADA system reliability evaluation considering performance requirement
    Su, CL
    Chang, YC
    2004 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY - POWERCON, VOLS 1 AND 2, 2004, : 574 - 579
  • [6] Design Optimization Considering Performance And Reliability
    Zeng, Shengkui
    Ma, Jiming
    Li, Feixia
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2009 PROCEEDINGS, 2009, : 201 - 205
  • [7] Data clustering based probabilistic UPFC allocation for improving power system reliability considering correlated uncertain variables
    Rezaeian-Marjani, Saeed
    Nazarpour, Daryoush
    Galvani, Sadjad
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2021, 31 (12)
  • [8] Transmission and Generation Expansion Planning Considering System Reliability and Line Maintenance
    Mahdavi, Meisam
    Macedo, Leonardo H.
    Romero, Ruben
    26TH IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE 2018), 2018, : 1005 - 1010
  • [9] Planning Wind Power Considering System Reliability in Peak Demand Time
    Yu, Zuwei
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 493 - 498
  • [10] Cooperative Operational Planning of Interruptible Load Contracts for Enhancing Performance Reliability of Multi-Microgrid Power Distribution Systems
    Farrokhi, Mahdi
    Fotuhi-Firuzabad, Mahmoud
    Safdarian, Amir
    Dehghanian, Payman
    IEEE ACCESS, 2024, 12 : 121610 - 121623