Experimental assessment of connections for precast concrete frames using ultra high performance fibre reinforced concrete

被引:100
作者
Maya, L. F. [1 ]
Zanuy, C. [2 ]
Albajar, L. [2 ]
Lopez, C. [3 ]
Portabella, J. [4 ]
机构
[1] FHWA, Turner Fairbank Highway Res Ctr, Mclean, VA 22101 USA
[2] Univ Politecn Madrid, Dept Continuum Mech & Struct, ETS Ingn Caminos, E-28040 Madrid, Spain
[3] Eduardo Torroja Inst Construct Sci, Madrid, Spain
[4] Prainsa, Tech Dept, Barcelona, Spain
关键词
UHPFRC; Splice; Precast concrete; Beam-column; Connection; BEAM-COLUMN JOINTS; BOND BEHAVIOR; SEISMIC TESTS; STRENGTH; BARS;
D O I
10.1016/j.conbuildmat.2013.07.002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Interest in precast construction system has been growing due to the emphasis on improving work zone safety, reducing construction time and environmental impact, while maintaining quality. This experimental study aimed to develop a method to connect precast elements avoiding the use of complex reinforcing details and inefficient construction processes. For that purpose, the outstanding properties of ultra high performance fibre reinforced concretes (UHPFRC) were used to develop continuity connections between precast elements. A two-stage experimental program was defined to study the behaviour of precast elements connected using short reinforcement splice lengths. In the first experimental stage, flexural beam tests were carried out to assess the use of short reinforcement splice lengths in continuity connections. In the second experimental stage, an alternative beam-column connection for precast construction using UHPFRC was proposed and tested. The configuration proposed avoids the interference between longitudinal and transversal reinforcement, reduces the in situ work and makes it possible to define an efficient and safe construction process. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:173 / 186
页数:14
相关论文
共 37 条
[1]  
Aarup B., 1998, ACI J SP, V180, P459
[2]  
AITCIN PC, 1998, STRUCTURAL ENG INT, V8, P140
[3]   Seismic tests of beam-to-column connections in a precast concrete frame [J].
Alcocer, SM ;
Carranza, R ;
Perez-Navarrete, D ;
Martinez, R .
PCI JOURNAL, 2002, 47 (03) :70-+
[4]  
[Anonymous], 2011, Building Code Requirements for Structural Concrete (ACI 318-11) and Commentary
[5]  
[Anonymous], 2010, BULLETIN
[6]  
Au FTK, 2005, P I CIVIL ENG-STR B, V158, P21, DOI 10.1680/stbu.2005.158.1.21
[7]  
Bayasi Z, 2002, ACI STRUCT J, V99, P772
[8]  
Brooke N, 2006, P NZ CONCRETE IND C
[9]   Bond behavior of strand embedded in fiber reinforced cementitious composites [J].
Chao, Shih-Ho ;
Naaman, Antoine E. ;
Parra-Montesinos, Gustavo J. .
PCI JOURNAL, 2006, 51 (06) :56-+
[10]  
Chao SH, 2009, ACI STRUCT J, V106, P897