Optimal offering and bidding strategies of renewable energy based large consumer using a novel hybrid robust-stochastic approach

被引:187
作者
Abedinia, Oveis [1 ]
Zareinejad, Mohsen [2 ]
Doranehgard, Mohammad Hossein [3 ]
Fathi, Gholamreza [4 ]
Ghadimi, Noradin [5 ]
机构
[1] Budapest Univ Technol & Econ, Budapest, Hungary
[2] Islamic Azad Univ, Dept Ind Engn, North Tehran Branch, Tehran, Iran
[3] Univ Alberta, Sch Min & Petr Engn, Dept Civil & Environm Engn, Edmonton, AB T6G 1H9, Canada
[4] Power & Water Univ Technol, Tehran, Iran
[5] Islamic Azad Univ, Ardabil Branch, Young Researchers & Elite Club, Ardebil, Iran
关键词
Large consumer; Hybrid robust-stochastic approach; Bidding and offering strategies; Bilateral contracts; Uncertainty; Photovoltaic (PV) system and wind turbine (WT); POWER HUB MODELS; ELECTRICITY PROCUREMENT; INDUSTRIAL CONSUMERS; STORAGE SYSTEM; OPTIMIZATION; PERFORMANCE; IGDT;
D O I
10.1016/j.jclepro.2019.01.085
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the restructured power market, the participation of large consumer in the market is a challenging issue due to their considerable load demand. To provide the required load of the large consumers with the lowest possible cost, appropriate strategies should be taken by the operator of the large consumer. In this paper, in order to get optimal offering and bidding strategies for a large industrial consumer, a new mathematical model is proposed. The uncertainties of load demand, power market prices, solar radiation, temperature and wind speed are taken into account in the proposed model by using hybrid robust stochastic approach. The load uncertainty is modeled using robust optimization approach while the other uncertainties are modeled using the stochastic approach. A linear model with integer variables is developed to derive offering and bidding curves, which are robust against the uncertainty associated with the load demand of the large consumer. Obtained results show that the higher amount of uncertain parameter is considered, the higher procurement price has resulted for the large consumer. Although, the higher paid price, the higher robustness against load uncertainty has resulted. In addition, total power procurement cost of the large consumer without considering load uncertainty, obtained as $40,060 while this amount is increased to $50,560 in order to be robust against load uncertainty. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:878 / 889
页数:12
相关论文
共 33 条
[1]   RETRACTED: Energy storage system and demand response program effects on stochastic energy procurement of large consumers considering renewable generation (Retracted article. See vol. 14, pg. 6040, 2020) [J].
Aalami, Habib Allah ;
Nojavan, Sayyad .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2016, 10 (01) :107-114
[2]   Two-stage discrete-continuous multi-objective load optimization: An industrial consumer utility approach to demand response [J].
Abdulaal, Ahmed ;
Moghaddass, Ramin ;
Asfour, Shihab .
APPLIED ENERGY, 2017, 206 :206-221
[3]   Mixed integer programming of generalized hydro-thermal self-scheduling of generating units [J].
Aghaei, J. ;
Ahmadi, A. ;
Shayanfar, H. A. ;
Rabiee, A. .
ELECTRICAL ENGINEERING, 2013, 95 (02) :109-125
[4]   Mixed integer programming of multiobjective hydro-thermal self scheduling [J].
Ahmadi, A. ;
Aghaei, J. ;
Shayanfar, H. A. ;
Rabiee, A. .
APPLIED SOFT COMPUTING, 2012, 12 (08) :2137-2146
[5]  
Avsar SG., 2001, Australian Economic Papers, V40, P479, DOI DOI 10.1111/1467-8454.00138
[6]   Robust discrete optimization and network flows [J].
Bertsimas, D ;
Sim, M .
MATHEMATICAL PROGRAMMING, 2003, 98 (1-3) :49-71
[7]  
Brooke A., 1998, GAMS USERS GUIDE INT
[8]  
Cleland N., 2016, INTEGRATING CONSUMPT, P23, DOI [10.1007/978-3-319-20430-7_4, DOI 10.1007/978-3-319-20430-7_4]
[9]  
Conejo A., 2010, INT SER OPER RES MAN, V153, pi, DOI DOI 10.1007/978-1-4419-7421-1
[10]   Risk-constrained electricity procurement for a large consumer [J].
Conejo, A. J. ;
Carrin, M. .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (04) :407-413