Erosion, transport and deposition of a sediment replenishment under flood conditions

被引:24
作者
Stahly, Severin [1 ]
Franca, Mario J. [2 ,3 ]
Robinson, Christopher T. [4 ]
Schleiss, Anton J. [1 ]
机构
[1] Ecole Polytech Fed Lausanne EPFL, Lab Construct Hydraul LCH, Lausanne, Switzerland
[2] IHE Delft Inst Water Educ, Delft, Netherlands
[3] Delft Univ Technol, Dept Hydraul Engn, Delft, Netherlands
[4] Swiss Fed Inst Aquat Sci & Technol EAWAG, Aquat Ecol Dept, Dubendorf, Switzerland
基金
瑞士国家科学基金会;
关键词
sediment transport; river morphology; RFID PIT tags; river restoration; sustainable hydropower management; artificial flood release; RIVER; TRACKING; CHANNEL; DAMS; PARTICLES; REGIME; TAGS;
D O I
10.1002/esp.4970
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
River reaches downstream of dams with constant residual discharge often lack sediment supply and periodic high flows due to dam sediment retention and flow regulation, respectively. To test a novel multi-deposit methodology for defining environmental flows for activating the dynamics of the river morphology downstream of dams, a flood was released from Rossens Dam in Switzerland. This event was combined for the first time with a multi-deposit configuration of sediment replenishment consisting of four artificial deposits allocated as alternate bars along the riverbanks as a restoration measure. To validate the sediment transport behaviour observed in laboratory tests, stones were equipped with radiofrequency identification (RFID) passive integrated transponder (PIT) tags, a fixed antenna was installed at the river bed and a mobile antenna was used to enable the investigation of the erosion, transport and deposition of replenished sediments. The duration of the erosion period was determined for the tracked stones, and average transport velocities were found to be on the order of 10(-3) m/s. To estimate the erosion efficiency of the flood, defined as the eroded tagged stones compared with the released water volume, the hydrograph was divided into different periods: rising limb, constant peak discharge, decreasing limb. During the rising limb of the flood, which lasted for 20% of the total flood duration, more than 40% of the PIT tags were transported. The defined erosion efficiency is a measure to support the hydrographic design of artificial flood releases from dams. The deposition of tagged stones resulted in a repeating cluster formation, as expected from previous laboratory experiments, creating an increase in hydraulic habitat diversity. Comparison of the results obtained in the field and from laboratory experiments confirmed the robustness of the multi-deposit sediment replenishment method. Combined with the knowledge gained on the erosion efficiency, these results could motivate further applications and research into multi-deposit sediment replenishment techniques as a habitat-oriented river restoration measure. (C) 2020 John Wiley & Sons, Ltd.
引用
收藏
页码:3354 / 3367
页数:14
相关论文
共 50 条
[31]   River Sediment Transport and Deposition Modeling [J].
Morales de Luna, T. ;
Castro Diaz, M. J. ;
Pares Madronal, C. .
NUMERICAL ANALYSIS AND APPLIED MATHEMATICS, VOLS 1 AND 2, 2009, 1168 :1437-+
[32]   Uranium comminution ages: Sediment transport and deposition time scales [J].
DePaolo, Donald J. ;
Lee, Victoria E. ;
Christensen, John N. ;
Maher, Kate .
COMPTES RENDUS GEOSCIENCE, 2012, 344 (11-12) :678-687
[33]   Sediment Transport and Flood Risk: Impact of Newly Constructed Embankments on River Morphology and Flood Dynamics in Kathmandu, Nepal [J].
Thapa, Saraswati ;
Sinclair, Hugh D. ;
Creed, Maggie J. ;
Borthwick, Alistair G. L. ;
Watson, C. Scott ;
Muthusamy, Manoranjan .
WATER RESOURCES RESEARCH, 2024, 60 (10)
[34]   Erosion and sediment transport modelling in Northern Puglia watersheds [J].
Gentile, F. ;
Bisantino, T. ;
Liuzzi, G. Trisorio .
MONTORING, SIMULATION, PREVENTION AND REMEDIATION OF DENSE DEBRIS FLOWS III, 2010, :199-212
[35]   An event-based model of soil erosion and sediment transport at the catchment scale [J].
Dymond, John R. ;
Vale, Simon S. .
GEOMORPHOLOGY, 2018, 318 :240-249
[36]   Erosion and sediment transport in the basin of the Yermasoyia Reservoir, Cyprus [J].
Hrissanthou, V ;
Kalpaktsidou, D .
HYDROLOGY OF MEDITERRANEAN AND SEMIARID REGIONS, 2003, 278 :353-358
[37]   Sediment Transport and Deposition in Sediment Replenished Artificial Discharges from Three Dams in the NE of Spain [J].
Serra, Teresa ;
Soler, Marianna ;
Barcelona, Aina ;
Colomer, Jordi .
PROCEEDINGS OF THE 39TH IAHR WORLD CONGRESS, 2022, :455-458
[38]   Assessing an overland flow resistance approach under equilibrium sediment transport conditions [J].
Nicosia, A. ;
Di Stefano, C. ;
Pampalone, V ;
Palmeri, V ;
Ferro, V .
CATENA, 2021, 207
[39]   Evaluating a general sediment transport model for linear incisions under field conditions [J].
Vanwalleghem, T. ;
Giraldez, J. V. ;
Jimenez-Hornero, F. J. ;
Laguna, A. .
EARTH SURFACE PROCESSES AND LANDFORMS, 2009, 34 (14) :1852-1857
[40]   Fine-sediment dynamics: towards an improved understanding of sediment erosion and transport [J].
Droppo, Ian G. ;
D'Andrea, Liana ;
Krishnappan, Bommanna G. ;
Jaskot, Christina ;
Trapp, Brian ;
Basuvaraj, Mahendran ;
Liss, Steven N. .
JOURNAL OF SOILS AND SEDIMENTS, 2015, 15 (02) :467-479