Time and Cost Performance of Costruction Projects in Southern and Cenrtal Regions of Penisular Malaysia

被引:0
|
作者
Rahman, Ismail Abdul [1 ]
Memon, Aftab Hameed [1 ]
Nagapan, Sasitharan [1 ]
Latif, Qadir Bux Alias Imran [1 ]
Azis, Ade Asmi Abdul [2 ]
机构
[1] Univ Tun Hussein Malaysia, Fac Civil & Environm Engn, Batu Pahat 86400, Johor, Malaysia
[2] Univ Bakrie, Jakarta, Indonesia
来源
2012 IEEE COLLOQUIUM ON HUMANITIES, SCIENCE & ENGINEERING RESEARCH (CHUSER 2012) | 2012年
关键词
time performance; cost performance; time overrun; cost overrun; mitigation measures; malaysia; CONSTRUCTION PROJECTS; OVERRUNS;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Time and cost performance is the fundamental criteria for success of any project. Unfortunately construction industry in Malaysia has been regarded as industry facing poor performance leading to failure in achieving effective time and cost performance. As a consequence most of the projects face huge amount of time and cost overrun. This study assessed the time and cost performance of construction projects in Malaysia using structured questionnaire survey. The findings of study revealed that 92% of construction projects were overrun and only 8% of project could achieve completion within contract duration. The amount of time overrun was in between 5-10% as agreed by respondents. In terms of cost performance only 11% of respondents mentioned that normally their projects are finished within the budgeted cost while 89% of respondents agreed that their projects were facing the problem of cost overrun with average overrun at 5-10% of contract price. The major contributors of this poor performance include design and documentation issues, financial resource management and project management and contract administration issues. Further, qualitative study was carried out using semi-structured interviews with the experience personnel involving in managing construction project which resulted in developing 13 mitigation measure to improve time performance and 15 mitigation measure to improve cost performance in construction project. This study will help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.
引用
收藏
页数:6
相关论文
共 9 条
  • [1] Study of Causative Factors of Cost Overrun in Large Projects of Southern Part of Peninsular Malaysia
    Memon, Aftab Hameed
    Rahman, Ismail Abdul
    Aziz, Ade Asmi Abdul
    INNOVATION MANAGEMENT AND SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE: FROM REGIONAL DEVELOPMENT TO GLOBAL GROWTH, VOLS I - VI, 2015, 2015, : 3580 - 3592
  • [2] Time and Cost Performance of Design-Build Projects
    Chen, Qing
    Jin, Zhigang
    Xia, Bo
    Wu, Peng
    Skitmore, Martin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)
  • [3] Evaluating Cost and Time Performance of Sri Lankan Construction Projects
    Rathnayake, Asitha
    Ranasinghe, Malik
    ENGINEER-JOURNAL OF THE INSTITUTION OF ENGINEERS SRI LANKA, 2020, 53 (03): : 79 - 89
  • [4] Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria
    Eze, Emmanuel Chidiebere
    Idiake, John Ebhohimen
    INTERNATIONAL JOURNAL OF BUILT ENVIRONMENT AND SUSTAINABILITY, 2018, 5 (01): : 56 - 67
  • [6] Factors affecting cost and time performance on highway construction projects: evidence from Thailand
    Meeampol, S.
    Ogunlana, S.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2006, 11 (01) : 3 - +
  • [7] The impact of client characteristics on the time and cost performance of collaborative infrastructure projects
    Manley, Karen
    Chen, Le
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2016, 23 (04) : 511 - 532
  • [8] Quantitative appraisal of cost and time performance of construction projects in public and private universities in Osun State, Nigeria
    Olatunde N.A.
    Alao O.O.
    Olatunde, Nathaniel Ayinde (nathaniel.olatunde@uniben.edu), 1600, Emerald Group Holdings Ltd. (15): : 619 - 634
  • [9] Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance
    Rachmawati, Farida
    Mudjahidin, Mudjahidin
    Widowati, Elok Dewi
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (02) : 213 - 225