Distribution Network Planning Evaluation Considering Risk Cost

被引:0
作者
Xu, Jianwei [1 ]
Su, Haifeng [1 ]
Liang, Zhirui [1 ]
机构
[1] Sch North China Elect Power Univ, Baoding 071000, Peoples R China
来源
PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND ENGINEERING APPLICATIONS | 2016年 / 63卷
关键词
Distribution Network; Planning; Life Cycle Cost; Risk;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
There are many uncertain factors that affect the planning of power network, and these uncertain risk factors appear in all stages of the life cycle. The uncertainty of load and electricity price directly affects the whole life cycle cost of the plan. In the whole life cycle cost calculation of power system planning, the uncertainty of load and electricity price is included, so that the whole life cycle cost evaluation of power system planning is more reasonable.
引用
收藏
页码:180 / 183
页数:4
相关论文
共 5 条
[1]  
Cao Shengnan, 2012, STUDY ELECT DISTRIBU
[2]  
Gao F, 2010, POWER SYST PROT CONT, V38, P75
[3]  
He Yong-xiu, 2011, Journal of North China Electric Power University, V38, P53
[4]  
Li Jun, 2012, Electric Power Automation Equipment, V32, P16
[5]  
Yuan Ping, 2009, POLICY TYPE ADJUSTME