FutureHome: An integrated construction automation approach

被引:23
作者
Balaguer, C
Abderrahim, M
Navarro, JM
Boudjabeur, S
Aromaa, P
Kahkonen, K
Slavenburg, S
Seward, D
Bock, T
Wing, R
Atkin, B
机构
[1] Univ Carlos III Madrid, Leganes, Madrid, Spain
[2] Tech Univ Munich, Sch Architecture, Construct Engn & Informat Technol Dept, D-8000 Munich, Germany
[3] Univ London Imperial Coll Sci Technol & Med, Dept Civil & Environm Engn, London, England
[4] Royal Inst Technol, KTH, Stockholm, Sweden
关键词
D O I
10.1109/100.993155
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Automated Robotic Mass Production of Construction Will Limit Dangers to Human Operators and Achieve Maximum Production Efficiency.
引用
收藏
页码:55 / 66
页数:12
相关论文
共 21 条
  • [1] Alfares M., 1996, Automation in Construction, V5, P323, DOI 10.1016/S0926-5805(96)00157-4
  • [2] Balaguer C., 2000, Proceedings of the 17th IAARC/CIB/IEEE/IFR International Symposium on Automation and Robotics in Construction. 17th ISAREC 2000, pK21
  • [3] BALAGUER C, 1996, P 13 INT S AUT ROB C, P65
  • [4] Bock T., 2000, Proceedings of the 17th IAARC/CIB/IEEE/IFR International Symposium on Automation and Robotics in Construction. 17th ISAREC 2000, P919
  • [5] Diez R., 2000, Proceedings of the 17th IAARC/CIB/IEEE/IFR International Symposium on Automation and Robotics in Construction. 17th ISAREC 2000, P1033
  • [6] DIEZ R, 1999, AUTOMATIZATION DISEN
  • [7] Gambao E, 1997, IEEE INT CONF ROBOT, P46, DOI 10.1109/ROBOT.1997.620014
  • [8] HEINTZE J, 1995, P 12 INT S AUT ROB C, P291
  • [9] Hubinsky P., 1998, Journal of Electrical Engineering, V49, P129
  • [10] Generation of 3D building models from 2D architectural plans
    Lewis, R
    Sequin, C
    [J]. COMPUTER-AIDED DESIGN, 1998, 30 (10) : 765 - 779