Multi-area reliability evaluation including frequency and duration indices with multiple time varying load curves

被引:13
作者
Justino, Thatiana C. [2 ]
Tancredo Borges, Carmen L. [1 ]
de Melo, Albert C. G. [2 ]
机构
[1] Univ Fed Rio de Janeiro, BR-21941972 Rio De Janeiro, Brazil
[2] Elect Power Res Ctr CEPEL, BR-21944970 Rio De Janeiro, Brazil
关键词
Multi-area reliability; Time varying load; Monte Carlo simulation; Frequency and duration indices; MONTE-CARLO SIMULATION; SYSTEM RELIABILITY; COMPOSITE; MODEL;
D O I
10.1016/j.ijepes.2012.04.016
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The reliability evaluation of multi-area systems is part of the expansion planning process of a power system. In order to accurately estimate the system and areas reliability indices, especially the frequency and duration (F&D) indices, the dynamic behavior of system components must be adequately represented with particular attention to the variation of each area load. Nowadays, the most efficient methods for multi-area reliability evaluation do not represent the chronological aspects of the different areas loads. The method that directly considers these aspects is the sequential Monte Carlo simulation, however requiring a high computational effort. This paper presents the application of some methods that represent the chronological aspects of the load to the reliability evaluation of multi-area systems and evaluates their performance and accuracy. The main purpose is to obtain a model for multi-area reliability evaluation that represents the different load curve of each area and accurately estimates the F&D indices. Results obtained by the studied methods are presented for two systems, one composed of two areas and the other based on a representation of the Brazilian interconnected power system with four areas. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:276 / 284
页数:9
相关论文
共 20 条
[1]   A SYSTEM STATE TRANSITION SAMPLING METHOD FOR COMPOSITE SYSTEM RELIABILITY EVALUATION [J].
BILLINTON, R ;
LI, W .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (03) :761-770
[2]   MONTE-CARLO SIMULATION-MODEL FOR MULTIAREA GENERATION SYSTEM RELIABILITY STUDIES [J].
BILLINTON, R ;
GAN, L .
IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1993, 140 (06) :532-538
[3]  
CEPEL, 2006, 5303206 CEPEL DPDEA
[4]   Multi-area generation scheduling algorithm with regionally distributed optimal power flow using alternating direction method [J].
Chung, K. H. ;
Kim, B. H. ;
Hur, D. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (09) :1527-1535
[5]   A Comparison of Load Models for Composite Reliability Evaluation by Nonsequential Monte Carlo Simulation [J].
Clement Veliz, Fabiola Ferreira ;
Tancredo Borges, Carmen Lucia ;
Rei, Andrea Mattos .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (02) :649-656
[6]   Pseudo-chronological simulation for composite reliability analysis with time varying loads [J].
da Silva, AML ;
Manso, LAD ;
Mello, JCD ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (01) :73-80
[7]   Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques [J].
Ding, Yi ;
Wang, Peng ;
Goel, Lalit ;
Billinton, Roy ;
Karki, Rajesh .
ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (12) :1665-1671
[8]  
Ford LR, 1962, FLOWS NETWORKS
[9]  
Justino TC, 2009, THESIS FEDERAL U RIO
[10]  
Kleijnen J., 1974, STAT TECHNIQUES SIMU