An approach for sustainable, cost-effective and optimised material design for the prefabricated non-structural components of residential buildings

被引:54
作者
Wasim, Muhammad [1 ]
Han, Thomas Michael [1 ]
Huang, Haoran [1 ]
Madiyev, Miras [1 ]
Ngo Tuan Duc [2 ]
机构
[1] Univ Melbourne, Sch Engn, Dept Infrastruct Engn, Parkville, Vic 3010, Australia
[2] Univ Melbourne, Adv Protect Technol Engn Struct APTES Grp, Dept Infrastruct Engn, Sch Engn, Parkville, Vic 3010, Australia
来源
JOURNAL OF BUILDING ENGINEERING | 2020年 / 32卷 / 32期
关键词
Prefabrication; Residential buildings; Timber frame wall; Plumbing drainage system; Site; Offsite; Design for manufacturing and assembly; Assembly times and cost analysis; MODULAR BUILDINGS; CONSTRUCTION; MANUFACTURE;
D O I
10.1016/j.jobe.2020.101474
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Offsite prefabrication of the non-structural components of residential and commercial low- and high-rise buildings is becoming increasingly popular due to its sustainability, fast on-site execution, safety and costeffectiveness. The benefits of offsite prefabrication can be further enhanced if it is coupled with the principles of Design for Manufacturing and Assembly (DfMA), which is based on materials, labours and cost optimisation. Although DfMA has been widely used in automotive and other industries, it is not well-established in the offsite prefabricated construction industry. Moreover, there are no guidelines exist for applying DfMA in prefabricated construction. In this paper, DfMA principles are applied to the most common non-structural members i.e., timber frame wall and the plumbing drainage system of a local residential building in Melbourne, Australia. Site and factory observations for the manufacturing of these components were carried out to collect actual assembly times. Then, using the collected data, the design efficiencies of onsite-, offsite- and DfMA-based prefabrication were computed by developing a user-friendly tool through advanced MATLAB programming. Moreover, from a cost-benefit analysis, DfMA-based prefabrication was found to be better than conventional factory prefabrication of selected non-structural components. Furthermore, based on the results, a pragmatic framework for DfMA based design and execution in a real prefabricated construction project is proposed. The findings of this paper are significant as they can contribute to developing guidelines for DfMA based design of prefabricated non-structural components of residential buildings.
引用
收藏
页数:13
相关论文
共 29 条
  • [1] [Anonymous], [No title captured]
  • [2] [Anonymous], 2020, PBC TODAY NEWS 0420
  • [3] Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules
    Aye, Lu
    Ngo, T.
    Crawford, R. H.
    Gammampila, R.
    Mendis, P.
    [J]. ENERGY AND BUILDINGS, 2012, 47 : 159 - 168
  • [4] PRODUCT DESIGN FOR MANUFACTURE AND ASSEMBLY
    BOOTHROYD, G
    [J]. COMPUTER-AIDED DESIGN, 1994, 26 (07) : 505 - 520
  • [5] Design for Manufacture and Assembly Oriented Design Approach to a Curtain Wall System: A Case Study of a Commercial Building in Wuhan, China
    Chen, Ke
    Lu, Weisheng
    [J]. SUSTAINABILITY, 2018, 10 (07)
  • [6] David M., 2011, VRANSON DEAN VS LEAN, P64
  • [7] Dozzi S.P., 1993, Productivity in Construction
  • [8] New advancements, challenges and opportunities of multi-storey modular buildings - A state-of-the-art review
    Ferdous, Wahid
    Bai, Yu
    Tuan Duc Ngo
    Manalo, Allan
    Mendis, Priyan
    [J]. ENGINEERING STRUCTURES, 2019, 183 : 883 - 893
  • [9] Design for manufacture and assembly in construction: a review
    Gao, Shang
    Jin, Ruoyu
    Lu, Weisheng
    [J]. BUILDING RESEARCH AND INFORMATION, 2020, 48 (05) : 538 - 550
  • [10] Design for manufacturing and assembly (DfMA): a preliminary study of factors influencing its adoption in Singapore
    Gao, Shang
    Low, Sui Pheng
    Nair, Kisnaa
    [J]. ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2018, 14 (06) : 440 - 456