共 50 条
- [31] Risk Assessment and Preliminary Study of Safety Management System on Construction Works FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING III, PTS 1-3, 2013, 368-370 : 1917 - 1921
- [33] Assessment of Maturity Level and Development of Risk Management Framework for Fraud Risk in Construction Company VISION 2025: EDUCATION EXCELLENCE AND MANAGEMENT OF INNOVATIONS THROUGH SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE, 2019, : 4923 - 4936
- [36] Developing the drilling tool for trenchless pipeline construction XX INTERNATIONAL SCIENTIFIC SYMPOSIUM OF STUDENTS, POSTGRADUATES AND YOUNG SCIENTISTS ON PROBLEMS OF GEOLOGY AND SUBSURFACE DEVELOPMENT, 2016, 43
- [39] Trans Mountain Employs Extensive Risk Mitigation Measures for Trenchless Construction on Their New Pipeline Expansion PIPELINES 2021: CONSTRUCTION AND REHABILITATION, 2021, : 321 - 330