共 50 条
- [1] Minimizing total weighted tardiness on a single machine with sequence-dependent setup and future ready time The International Journal of Advanced Manufacturing Technology, 2013, 67 : 281 - 294
- [4] Energy-Efficient Single Machine Total Weighted Tardiness Problem with Sequence-Dependent Setup Times INTELLIGENT COMPUTING THEORIES AND APPLICATION, PT I, 2018, 10954 : 746 - 758
- [8] A heuristic algorithm to minimize total weighted tardiness on a single machine with release dates and sequence-dependent setup times Journal of the Chinese Institute of Industrial Engineers, 2004, 21 (03): : 289 - 300