Minimising the makespan in the two-machine job shop problem under availability constraints

被引:12
|
作者
Benttaleb, Mourad [1 ]
Hnaien, Faicel [1 ]
Yalaoui, Farouk [1 ]
机构
[1] Univ Technol Troyes, ICD LOSI, UMR CNRS 6281, Troyes, France
关键词
job shop scheduling; availability constraints; mixed integer linear programming; branch and bound; makespan; FLOWSHOP SCHEDULING PROBLEM; MACHINE; MINIMIZATION;
D O I
10.1080/00207543.2018.1489160
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Classical scheduling problem assumes that machines are available during the scheduling horizon. This assumption may be justified in some situations but it does not apply if maintenance requirements, machine breakdowns or other availability constraints have to be considered. In this paper, we treat a two-machine job shop scheduling problem with one availability constraint on each machine to minimise the maximum completion time (makespan). The unavailability periods are known in advance and the processing of an operation cannot be interrupted by an unavailability period (non-preemptive case). We present in our approach properties dealing with permutation dominance and the optimality of Jackson's rule under availability constraints. In order to evaluate the effectiveness of the proposed approach, we develop two mixed integer linear programming models and two schemes for a branch and bound method to solve the tackled problem. Computational results validate the proposed approach and prove the efficiency of the developed methods.
引用
收藏
页码:1427 / 1457
页数:31
相关论文
共 50 条
  • [21] Minimizing makespan in a two-machine flow shop with effects of deterioration and learning
    Wang, Ji-Bo
    Ji, P.
    Cheng, T. C. E.
    Wang, Dan
    OPTIMIZATION LETTERS, 2012, 6 (07) : 1393 - 1409
  • [22] Minimizing Makespan with Start Time-Dependent Jobs in a Two-Machine Flow Shop
    Jafari, A. A.
    Zare, H. Khademi
    Lotfi, M. M.
    Tavakkoli-Moghaddam, R.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2016, 29 (06): : 778 - 787
  • [23] Minimizing makespan in a two-machine flow shop with effects of deterioration and learning
    Ji-Bo Wang
    P. Ji
    T. C. E. Cheng
    Dan Wang
    Optimization Letters, 2012, 6 : 1393 - 1409
  • [24] Two-machine open shop scheduling with an availability constraint
    Breit, J
    Schmidt, G
    Strusevich, VA
    OPERATIONS RESEARCH LETTERS, 2001, 29 (02) : 65 - 77
  • [25] Two-machine flow shop scheduling with two criteria:: Maximum earliness and makespan
    Toktas, B
    Azizoglu, M
    Köksalan, SK
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 157 (02) : 286 - 295
  • [26] Minimizing makespan in a two-machine no-wait flow shop with batch processing machines
    Muthuswamy, Shanthi
    Velez-Gallego, Mario C.
    Maya, Jairo
    Rojas-Santiago, Miguel
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 63 (1-4) : 281 - 290
  • [27] Two-machine flowshop scheduling with availability constraints
    Lee, CY
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 114 (02) : 420 - 429
  • [28] A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints
    Chuanli Zhao
    Hengyong Tang
    Optimization Letters, 2011, 5 : 183 - 190
  • [29] A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints
    Zhao, Chuanli
    Tang, Hengyong
    OPTIMIZATION LETTERS, 2011, 5 (01) : 183 - 190
  • [30] Two-machine job-shop scheduling with one joint job
    Numaguchi, Hiroki
    Wu, Wei
    Hu, Yannan
    DISCRETE APPLIED MATHEMATICS, 2024, 346 : 30 - 43