共 50 条
- [22] Minimizing Makespan with Start Time-Dependent Jobs in a Two-Machine Flow Shop INTERNATIONAL JOURNAL OF ENGINEERING, 2016, 29 (06): : 778 - 787
- [23] Minimizing makespan in a two-machine flow shop with effects of deterioration and learning Optimization Letters, 2012, 6 : 1393 - 1409
- [28] A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints Optimization Letters, 2011, 5 : 183 - 190