Bilevel and multi-objective dynamic construction site layout and security planning

被引:31
作者
Li, Zongmin [1 ,3 ]
Shen, Wenjing [3 ]
Xu, Jiuping [1 ,2 ]
Lev, Benjamin [3 ]
机构
[1] Sichuan Univ, Sch Business, Chengdu 610064, Peoples R China
[2] Sichuan Univ, State Key Lab Hydraul & Mt River Engn, Chengdu 610064, Peoples R China
[3] Drexel Univ, Dept Decis Sci, LeBow Coll Business, Philadelphia, PA 19104 USA
关键词
Dynamic construction site layout and security; Bilevel multi-objective model; Particle Swarm Optimization Algorithm; CRITICAL INFRASTRUCTURE; OPTIMIZATION; ALGORITHMS; SELECTION; EVOLUTION; MODEL;
D O I
10.1016/j.autcon.2015.04.011
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The joint problem of dynamic construction site layout and security planning is fundamental to any construction project. However, it is still largely unexplored. Few research studies investigated the implementation of security measures during the construction phase. This paper proposes a bilevel multi-objective model for the dynamic construction site layout and security planning problem. Specifically, the upper-level programming denotes that the project manager must first choose the construction site layout and security strategies to minimize the layout costs and consequences of a potential attack. The lower-level programming denotes that the attacker will destroy a subset of the facilities to inflict the maximum economic consequence on the construction facilities system. Thereafter, a bilevel multi-objective Particle Swarm Optimization Algorithm (MOBLPSO) is designed to solve this model. Finally, the approach is carried out in the Xiajiang hydropower large-scale construction project to illustrate the effectiveness of the proposed model and algorithm. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:1 / 16
页数:16
相关论文
共 46 条
  • [31] Cost-safety trade-off in unequal-area construction site layout planning
    Ning, Xin
    Lam, Ka Chi
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 32 : 96 - 103
  • [32] A decision-making system for construction site layout planning
    Ning, Xin
    Lam, Ka-Chi
    Lam, Mike Chun-Kit
    [J]. AUTOMATION IN CONSTRUCTION, 2011, 20 (04) : 459 - 473
  • [33] Dynamic construction site layout planning using max-min ant system
    Ning, Xin
    Lam, Ka-Chi
    Lam, Mike Chun-Kit
    [J]. AUTOMATION IN CONSTRUCTION, 2010, 19 (01) : 55 - 65
  • [34] Designing robust coverage networks to hedge against worst-case facility losses
    O'Hanley, Jesse R.
    Church, Richard L.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 209 (01) : 23 - 36
  • [35] Optimizing the planning of construction site security for critical infrastructure projects
    Said, Hisham
    El-Rayes, Khaled
    [J]. AUTOMATION IN CONSTRUCTION, 2010, 19 (02) : 221 - 234
  • [36] On the Stackelberg Strategy in Nonzero-Sum Games
    Simaan, M.
    Cruz, J. B., Jr.
    [J]. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1973, 11 (05) : 533 - 555
  • [37] SYSWERDA G., 1991, PROC 4 INT C GENETIC, P502
  • [38] The particle swarm optimization algorithm: convergence analysis and parameter selection
    Trelea, IC
    [J]. INFORMATION PROCESSING LETTERS, 2003, 85 (06) : 317 - 325
  • [39] A Convergence Proof for the Particle Swarm Optimiser
    van den Bergh, Frans
    Engelbrecht, Andries Petrus
    [J]. FUNDAMENTA INFORMATICAE, 2010, 105 (04) : 341 - 374
  • [40] Applying Multiobjective Bilevel Optimization under Fuzzy Random Environment to Traffic Assignment Problem: Case Study of a Large-Scale Construction Project
    Xu, Jiuping
    Tu, Yan
    Lei, Xiao
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2014, 20 (03)