HISTORIC BIM: A NEW REPOSITORY FOR STRUCTURAL HEALTH MONITORING

被引:41
作者
Banfi, F. [1 ]
Barazzetti, L. [1 ]
Previtali, M. [1 ]
Roncoroni, F. [2 ]
机构
[1] Politecn Milan, Dept Architecture Built Environm & Construct Engn, Piazza Leonardo da Vinci 32, Milan, Italy
[2] Polo Terr Lecco, Via Previati 1-C, Lecce, Italy
来源
GEOMATICS & RESTORATION - CONSERVATION OF CULTURAL HERITAGE IN THE DIGITAL ERA | 2017年 / 42-5卷 / W1期
关键词
Archive; BIM; Bridge; HBIM; Monitoring; Repository; CLOUDS; LASER;
D O I
10.5194/isprs-archives-XLII-5-W1-269-2017
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Recent developments in Building Information Modelling (BIM) technologies are facilitating the management of historic complex structures using new applications. This paper proposes a generative method combining the morphological and typological aspects of the historic buildings (H-BIM), with a set of monitoring information. This combination of 3D digital survey, parametric modelling and monitoring datasets allows for the development of a system for archiving and visualizing structural health monitoring (SHM) data (Fig. 1). The availability of a BIM database allows one to integrate a different kind of data stored in different ways (e.g. reports, tables, graphs, etc.) with a representation directly connected to the 3D model of the structure with appropriate levels of detail (LoD). Data can be interactively accessed by selecting specific objects of the BIM, i.e. connecting the 3D position of the sensors installed with additional digital documentation. Such innovative BIM objects, which form a new BIM family for SHM, can be then reused in other projects, facilitating data archiving and exploitation of data acquired and processed. The application of advanced modeling techniques allows for the reduction of time and costs of the generation process, and support cooperation between different disciplines using a central workspace. However, it also reveals new challenges for parametric software and exchange formats. The case study presented is the medieval bridge Azzone Visconti in Lecco (Italy), in which multi-temporal vertical movements during load testing were integrated into H-BIM.
引用
收藏
页码:269 / 274
页数:6
相关论文
共 16 条
[1]   INTEGRATION OF JEDDAH HISTORICAL BIM AND 3D GIS FOR DOCUMENTATION AND RESTORATION OF HISTORICAL MONUMENT [J].
Baik, A. ;
Yaagoubi, R. ;
Boehm, J. .
25TH INTERNATIONAL CIPA SYMPOSIUM 2015, 2015, 40-5 (W7) :29-34
[2]   BIM FROM LASER CLOUDS AND FINITE ELEMENT ANALYSIS: COMBINING STRUCTURAL ANALYSIS AND GEOMETRIC COMPLEXITY [J].
Barazzetti, L. ;
Banfi, F. ;
Brumana, R. ;
Gusmeroli, G. ;
Oreni, D. ;
Previtali, M. ;
Roncoroni, F. ;
Schiantarelli, G. .
3D-ARCH 2015 - 3D VIRTUAL RECONSTRUCTION AND VISUALIZATION OF COMPLEX ARCHITECTURES, 2015, 40-5 (W4) :345-350
[3]   Creation of Parametric BIM Objects from Point Clouds Using Nurbs [J].
Barazzetti, L. ;
Banfi, F. ;
Brumana, R. ;
Previtali, M. .
PHOTOGRAMMETRIC RECORD, 2015, 30 (152) :339-362
[4]   Cloud-to-BIM-to-FEM: Structural simulation with accurate historic BIM from laser scans [J].
Barazzetti, Luigi ;
Banfi, Fabrizio ;
Brumana, Raffaella ;
Gusmeroli, Gaia ;
Previtali, Mattia ;
Schiantarelli, Giuseppe .
SIMULATION MODELLING PRACTICE AND THEORY, 2015, 57 :71-87
[5]   Measurement-based modification of NURBS surfaces [J].
Brujic, D ;
Ristic, M ;
Ainsworth, I .
COMPUTER-AIDED DESIGN, 2002, 34 (03) :173-183
[6]   STRATEGY FOR INTEGRATED SURVEYING TECHNIQUES FINALIZED TO INTERPRETIVE MODELS IN A BYZANTINE CHURCH, MESOPOTAM, ALBANIA [J].
Brumana, Raffaella ;
Oreni, Daniela ;
Cuca, Branka ;
Binda, Luigia ;
Condoleo, Paola ;
Triggiani, Maurizio .
INTERNATIONAL JOURNAL OF ARCHITECTURAL HERITAGE, 2014, 8 (06) :886-924
[7]   Structural Simulations and Conservation Analysis - Historic Building Information Model (HBIM) [J].
Dore, C. ;
Murphy, M. ;
McCarthy, S. ;
Brechin, F. ;
Casidy, C. ;
Dirix, E. .
3D-ARCH 2015 - 3D VIRTUAL RECONSTRUCTION AND VISUALIZATION OF COMPLEX ARCHITECTURES, 2015, 40-5 (W4) :351-357
[8]  
Eastman C.M., 2008, BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors
[9]  
Fai S., 2011, CIPA 2011 C P 23 INT
[10]   Modifying the shape of NURBS surfaces with geometric constraints [J].
Hu, SM ;
Li, YF ;
Ju, T ;
Zhu, X .
COMPUTER-AIDED DESIGN, 2001, 33 (12) :903-912