Hybrid flow shop scheduling considering machine electricity consumption cost

被引:330
作者
Luo, Hao [1 ]
Du, Bing [2 ]
Huang, George Q. [1 ]
Chen, Huaping [3 ]
Li, Xiaolin [2 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, HKU ZIRI Lab Phys Internet, Hong Kong, Hong Kong, Peoples R China
[2] Univ Sci & Technol China, Sch Management, Hefei 230026, Peoples R China
[3] Univ Sci & Technol China, Sch Comp Sci & Technol, Hefei 230026, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid flow shop; Scheduling; Makespan; Electric power cost; Multi-objective optimization; Ant colony optimization; ANT COLONY OPTIMIZATION; ENERGY-CONSUMPTION; GENETIC ALGORITHM; UNIFORM MACHINES; 2-STAGE; SYSTEM; FLOWSHOPS; MINIMIZATION; ALLOCATION; TARDINESS;
D O I
10.1016/j.ijpe.2013.01.028
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Hybrid flow shop (HFS) scheduling has been extensively examined and the main objective has been to improve production efficiency. However, limited attention has been paid to the consideration of energy consumption with the advent of green manufacturing. This paper proposes a new ant colony optimization (MOACO) meta-heuristic considering not only production efficiency but also electric power cost (EPC) with the presence of time-of-use (TOU) electricity prices. The solution is encoded as a permutation of jobs. A list schedule algorithm is applied to construct the sequence by artificial ants and generate a complete schedule. A right-shift procedure is then used to adjust the start time of operations aiming to minimize the EPC for the schedule. In terms of theoretical research aspect, the results from computational experiments indicate that the efficiency and effectiveness of the proposed MOACO are comparable to NSGA-II and SPEA2. In terms of practical application aspect, the guideline about how to set preference over multiple objectives has been studied. This result has significant managerial implications in real life production. The parameter analysis also shows that durations of TOU periods and processing speed of machines have great influence on scheduling results as longer off-peak period and use of faster machines provide more flexibility for shifting high-energy operations to off-peak periods. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:423 / 439
页数:17
相关论文
共 61 条
[1]   BPSS - A SCHEDULING SUPPORT SYSTEM FOR THE PACKAGING INDUSTRY [J].
ADLER, L ;
FRAIMAN, N ;
KOBACKER, E ;
PINEDO, M ;
PLOTNICOFF, JC ;
WU, TP .
OPERATIONS RESEARCH, 1993, 41 (04) :641-648
[2]  
Agnes Pechmann, 2011, P 18 CIRP INT C LIF
[3]   Scheduling two-stage hybrid flow shop with availability constraints [J].
Allaoui, H ;
Artiba, A .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (05) :1399-1419
[4]  
BMWi, 2009, EN STAT
[5]   Inspiration for optimization from social insect behaviour [J].
Bonabeau, E ;
Dorigo, M ;
Theraulaz, G .
NATURE, 2000, 406 (6791) :39-42
[6]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[7]   Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach [J].
Chan, Felix T. S. ;
Chung, S. H. ;
Chan, L. Y. ;
Finke, G. ;
Tiwari, M. K. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2006, 22 (5-6) :493-504
[8]   Effective allocation of customers to distribution centres: A multiple ant colony optimization approach [J].
Chan, Felix T. S. ;
Kumar, Niraj .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2009, 25 (01) :1-12
[9]   Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS [J].
Chan, FTS ;
Swarnkar, R .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2006, 22 (04) :353-362
[10]   A decision support system for production scheduling in an ion plating cell [J].
Chan, FTS ;
Au, KC ;
Chan, PLY .
EXPERT SYSTEMS WITH APPLICATIONS, 2006, 30 (04) :727-738