Challenges and solutions for the tunnel ventilation system of the Doha Metro project shall be presented. Particular requirements of the Doha Metro system result from the outside climate conditions, the scale of the project, the mutual interaction of the metro lines and the civil constraints. On the basis of the design objectives and the project boundary conditions, a feasible solution of the tunnel ventilation system is presented.