Prototyping Control and Data Acquisition for the ITER Neutral Beam Test Facility

被引:6
作者
Luchetta, Adriano [1 ]
Manduchi, Gabriele [1 ]
Taliercio, Cesare [1 ]
Soppelsa, Anton [1 ]
Paolucci, Francesco [2 ]
Sartori, Filippo [2 ]
Barbato, Paolo [1 ]
Breda, Mauro [1 ]
Capobianco, Roberto [1 ]
Molon, Federico [1 ]
Moressa, Modesto [1 ]
Polato, Sandro [1 ]
Simionato, Paola [1 ]
Zampiva, Enrico [1 ]
机构
[1] Consorzio RFX, I-35127 Padua, Italy
[2] Fus Energy, Barcelona 08019, Spain
关键词
ITER; neutral beam injector; neutral beam test facility; SYSTEM;
D O I
10.1109/TNS.2013.2281264
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The ITER Neutral Beam Test Facility will be the project's R&D facility for heating neutral beam injectors (HNB) for fusion research operating with H/D negative ions. Its mission is to develop technology to build the HNB prototype injector meeting the stringent HNB requirements (16.5 MW injection power, -1 MeV acceleration energy, 40 A ion current and one hour continuous operation). Two test-beds will be built in sequence in the facility: first SPIDER, the ion source test-bed, to optimize the negative ion source performance, second MITICA, the actual prototype injector, to optimize ion beam acceleration and neutralization. The SPIDER control and data acquisition system is under design. To validate the main architectural choices, a system prototype has been assembled and performance tests have been executed to assess the prototype's capability to meet the control and data acquisition system requirements. The prototype is based on open-source software frameworks running under Linux. EPICS is the slow control engine, MDSplus is the data handler and MARTe is the fast control manager. The prototype addresses low and high-frequency data acquisition, 10 kS/s and 10 MS/s respectively, camera image acquisition, data archiving, data streaming, data retrieval and visualization, real time fast control with 100 control cycle and supervisory control. The paper shows how the proposed prototype architecture can address the most critical requirements of SPIDER control.
引用
收藏
页码:3454 / 3460
页数:7
相关论文
共 50 条
  • [21] Assessment of IEEE 1588-Based Timing System of the ITER Neutral Beam Test Facility
    Trevisan, L.
    Luchetta, A.
    Manduchi, G.
    Taliercio, C.
    Rigoni, A.
    Barbato, P.
    IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 2023, 70 (06) : 882 - 889
  • [22] Functional safety assessment process for MITICA safety system in the ITER neutral beam test facility
    Grando, Luca
    Battistella, Manuela
    Dal Bello, Samuele
    Luchetta, Adriano
    Moressa, Modesto
    Munari, Silvia
    Gueccia, Alessandro
    Piccini, Michele
    FUSION ENGINEERING AND DESIGN, 2023, 193
  • [23] Vessel design and interfaces development for the 1 MV ITER Neutral Beam injector and Test Facility
    Rigato, Wladi
    Dal Bello, Samuele
    Marcuzzi, Diego
    Rizzolo, Andrea
    FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1606 - 1610
  • [24] Progress in the realization of the PRIMA neutral beam test facility
    Toigo, V.
    Boilson, D.
    Bonicelli, T.
    Piovan, R.
    Hanada, M.
    Chakraborty, A.
    Agarici, G.
    Antoni, V.
    Baruah, U.
    Bigi, M.
    Chitarin, G.
    Dal Bello, S.
    Decamps, H.
    Graceffa, J.
    Kashiwagi, M.
    Hemsworth, R.
    Luchetta, A.
    Marcuzzi, D.
    Masiello, A.
    Paolucci, F.
    Pasqualotto, R.
    Patel, H.
    Pomaro, N.
    Rotti, C.
    Serianni, G.
    Simon, M.
    Singh, M.
    Singh, N. P.
    Svensson, L.
    Tobari, H.
    Watanabe, K.
    Zaccaria, P.
    Agostinetti, P.
    Agostini, M.
    Andreani, R.
    Aprile, D.
    Bandyopadhyay, M.
    Barbisan, M.
    Battistella, M.
    Bettini, P.
    Blatchford, P.
    Boldrin, M.
    Bonomo, F.
    Bragulat, E.
    Brombin, M.
    Cavenago, M.
    Chuilon, B.
    Coniglio, A.
    Croci, G.
    Dalla Palma, M.
    NUCLEAR FUSION, 2015, 55 (08)
  • [25] CONTROL STRATEGY FOR THE ACCELERATION VOLTAGE OF THE ITER NEUTRAL BEAM INJECTOR
    Ferro, A.
    Zanotto, L.
    Toigo, V.
    2011 IEEE/NPSS 24TH SYMPOSIUM ON FUSION ENGINEERING (SOFE), 2011,
  • [26] Control Strategy for the Acceleration Voltage of the ITER Neutral Beam Injector
    Ferro, Alberto
    Zanotto, Loris
    Toigo, Vanni
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2012, 40 (03) : 564 - 569
  • [27] Toward a Large RF Ion Source for the ITER Neutral Beam Injector: Overview of the ELISE Test Facility and First Results
    Nocentini, Riccardo
    Fantz, Ursel
    Franzen, Peter
    Froeschle, Markus
    Heinemann, Bernd
    Riedl, Rudolf
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2014, 42 (03) : 616 - 623
  • [28] Cryosorption pumps for a neutral beam injector test facility
    Dremel, M.
    Mack, A.
    Day, C.
    Jensen, H.
    ADVANCES IN CRYOGENIC ENGINEERING, VOLS 51A AND B, 2006, 823 : 583 - +
  • [29] Local control unit for ITER-India gyrotron test facility (IIGTF)
    Rathod, Vipal
    Shah, Ronak
    Mandge, Deepak
    Parmar, Rajvi
    Rao, S. L.
    FUSION ENGINEERING AND DESIGN, 2016, 112 : 897 - 905
  • [30] TJ-II neutral beam injectors control and data acquisition system
    Martínez-Laso, L
    Liniers, M
    Alonso, J
    Botija, J
    García, A
    Medrano, M
    FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 477 - 480